X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304210209000

Well Details

Well ID: 0304210209000
Loading map...
Location: 00/09-02-030-21W4/0
Location Alias: 00/09-02-30-21 W4M
Location Alias 2: 00/09-02-030-21 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 21
Section: 02
County/Municipality: Starland County
Well Name: MARQUEE W DRUM 9-2-30-21
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0006985
License Date: 1953-08-25
License Status: Suspension
Spud Date: 1953-09-09
Final Drill Date: 1953-10-11
Well Total Depth: 1741.30 m
Surface Hole Latitude: 51.541466
Surface Hole Longitude: -112.844144

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-25 Obtained License
1953-10-11 Finished Drilling
1953-10-11 Production Casing Operation Performed
1953-10-11 Well Mode changed to Drilled and Cased
1953-10-16 Perforation Treatment Performed - Jet Perforation
1953-10-20 Well Began Production
1953-10-20 Well Fluid changed to Crude Oil
1953-10-20 Well Mode changed to Flowing
1961-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-06 Perforation Treatment Performed - Cement Squeeze
1961-09-09 Perforation Treatment Performed - Jet Perforation
1961-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-12 Well Fluid changed to Crude Oil
1961-09-12 Well Mode changed to Pumping
1977-11-06 Perforation Treatment Performed - Cement Squeeze
1977-11-08 Perforation Treatment Performed - Jet Perforation
1977-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-06 Perforation Treatment Performed - Jet Perforation
1978-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-06 Well Log Performed
1983-12-10 Perforation Treatment Performed - Cement Squeeze
1983-12-13 Perforation Treatment Performed - Jet Perforation
1983-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-22 Well Log Performed
1987-04-23 Well Log Performed
1987-08-14 Well Log Performed
1987-09-09 Well Log Performed
1987-09-11 Perforation Treatment Performed - Cement Squeeze
1987-09-15 Perforation Treatment Performed - Acid Wash - No Pressure
1987-09-15 Perforation Treatment Performed - Jet Perforation
1988-02-10 Well Log Performed
1988-02-12 Perforation Treatment Performed - Cement Squeeze
1988-02-16 Well Log Performed
1988-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-17 Perforation Treatment Performed - Jet Perforation
1988-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-18 Perforation Treatment Performed - Jet Perforation
1988-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-19 Perforation Treatment Performed - Jet Perforation
1996-10-13 Perforation Treatment Performed - Acid Wash - No Pressure
1996-10-13 Perforation Treatment Performed - Jet Perforation
1996-10-13 Well Log Performed
2008-04-26 Well Fluid changed to Crude Oil
2008-04-26 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-16 Perforation 1700.80 1703.80 13
1978-07-06 Acid Treatment 1697.70 1699.30 0
1978-07-06 Perforation 1697.70 1699.30 13
1978-07-08 Acid Treatment 1697.70 1699.30 0
1979-06-26 Acid Treatment 1697.70 1699.30 0
1983-12-10 Cement Squeeze 1697.70 1699.30 0
1983-12-13 Perforation 1692.20 1695.90 13
1983-12-14 Acid Treatment 1692.20 1695.90 0
1987-09-11 Cement Squeeze 1692.00 1695.90 0
1987-09-15 Perforation 1690.00 1693.00 13
1987-09-15 Acid Wash 1690.00 1693.00 0
1961-09-06 Acid Treatment 1700.80 1703.80 0
1988-02-12 Cement Squeeze 1690.00 1693.00 0
1988-02-17 Perforation 1691.60 1694.60 13
1988-02-17 Acid Treatment 1691.60 1694.60 0
1988-02-18 Perforation 1694.50 1696.00 13
1988-02-18 Acid Treatment 1691.60 1696.00 0
1988-02-19 Perforation 1689.10 1691.60 13
1988-02-19 Acid Treatment 1689.10 1696.00 0
1996-10-13 Perforation 1681.50 1685.00 17
1996-10-13 Acid Wash 1681.50 1685.00 0
1961-09-06 Cement Squeeze 1700.80 1703.80 0
1961-09-09 Perforation 1723.90 1724.90 13
1961-09-10 Acid Treatment 1723.90 1724.90 0
1977-11-06 Cement Squeeze 1723.90 1724.90 0
1977-11-08 Perforation 1697.70 1699.30 13
1977-11-11 Acid Treatment 1697.70 1699.30 0
1977-11-13 Acid Treatment 1697.70 1699.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1971 790 0.0 0.0 0.0
1972 3251 0.0 0.0 0.0
1973 7019 0.0 0.0 0.0
1974 5005 0.0 0.0 0.0
1975 6582 0.0 0.0 0.0
1976 6249 0.0 0.0 0.0
1977 5553 0.0 0.0 0.0
1978 3498 0.0 0.0 0.0
1979 8147 0.0 0.0 0.0
1980 7786 0.0 0.0 0.0
1981 7012 0.0 0.0 0.0
1982 5431 0.0 0.0 0.0
1983 7698 0.0 0.0 0.0
1984 8597 0.0 0.0 0.0
1985 8254 0.0 0.0 0.0
1986 8467 0.0 0.0 0.0
1987 7966 0.0 0.0 0.0
1988 8331 0.0 0.0 0.0
1989 8248 0.0 0.0 0.0
1990 8712 0.0 0.0 0.0
1991 8522 0.0 0.0 0.0
1992 7648 0.0 0.0 0.0
1993 6548 0.0 0.0 0.0
1994 8563 0.0 0.0 0.0
1995 8455 0.0 0.0 0.0
1996 8110 0.0 0.0 0.0
1997 7542 0.0 0.0 0.0
1998 6659 0.0 0.0 0.0
1999 8631 0.0 0.0 0.0
2000 8621 0.0 0.0 0.0
2001 8394 0.0 0.0 0.0
2002 8737 0.0 0.0 0.0
2003 8414 0.0 0.0 0.0
2004 8719 0.0 0.0 0.0
2005 8585 0.0 0.0 0.0
2006 8668 0.0 0.0 0.0
2007 853 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References