X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304210208020

Well Details

Well ID: 0304210208020
Loading map...
Location: 02/08-02-030-21W4/0
Location Alias: 02/08-02-30-21 W4M
Location Alias 2: 02/08-02-030-21 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 21
Section: 02
County/Municipality: Starland County
Well Name: BEARSPAW ET AL 102 DRUMW 8-2-30-21
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0007506
License Date: 1953-12-22
License Status: Abandoned
Spud Date: 1954-01-13
Final Drill Date: 1954-02-16
Well Total Depth: 1745.00 m
Surface Hole Latitude: 51.537984
Surface Hole Longitude: -112.843664

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-22 Obtained License
1954-02-16 Finished Drilling
1954-02-16 Well Mode changed to Drilled and Cased
1954-02-17 Production Casing Operation Performed
1954-02-19 Perforation Treatment Performed - Jet Perforation
1954-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-02-23 Well Began Production
1954-02-23 Well Fluid changed to Crude Oil
1954-02-23 Well Mode changed to Flowing
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1988-07-01 Well Fluid changed to Crude Oil
1988-07-01 Well Mode changed to Suspended
1989-04-01 Well Fluid changed to Crude Oil
1989-04-01 Well Mode changed to Pumping
1989-05-15 Well Fluid changed to Crude Oil
1989-05-15 Well Mode changed to Suspended
1990-07-16 Well Fluid changed to Crude Oil
1990-07-16 Well Mode changed to Pumping
1991-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-16 Plug Back Performed
1991-10-16 Well Fluid changed to Crude Oil
1991-10-16 Well Mode changed to Abandoned Zone
1991-10-17 Perforation Treatment Performed - Jet Perforation
2000-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-22 Plug Back Performed
2000-11-22 Well Log Performed
2000-11-24 Perforation Treatment Performed - Jet Perforation
2000-11-24 Well Log Performed
2000-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-01 Perforation Treatment Performed - Cement Plug
2000-12-01 Perforation Treatment Performed - Jet Perforation
2000-12-01 Plug Back Performed
2000-12-01 Well Log Performed
2001-05-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-02-19 Perforation 1717.20 1719.10 13
2000-12-01 Cement Plug 253.60 300.50 0
1954-02-22 Acid Treatment 1717.20 1719.10 0
1991-10-16 Packing Device Capped w/Cement 1704.00 1712.00 0
1991-10-17 Perforation 1681.00 1682.20 14
2000-11-22 Packing Device Capped w/Cement 1662.00 1670.00 0
2000-11-24 Perforation 1339.30 1341.40 16
2000-11-24 Perforation 1345.40 1348.80 16
2000-12-01 Packing Device Capped w/Cement 1327.00 1335.00 0
2000-12-01 Perforation 300.00 300.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7830 0.0 0.0 0.0
1968 4907 0.0 0.0 0.0
1969 5583 0.0 0.0 0.0
1970 5229 0.0 0.0 0.0
1971 6402 0.0 0.0 0.0
1972 8328 0.0 0.0 0.0
1973 8545 0.0 0.0 0.0
1974 7896 0.0 0.0 0.0
1975 8063 0.0 0.0 0.0
1976 8343 0.0 0.0 0.0
1977 8527 0.0 0.0 0.0
1978 8463 0.0 0.0 0.0
1979 8544 0.0 0.0 0.0
1980 8484 0.0 0.0 0.0
1981 8005 0.0 0.0 0.0
1982 8229 0.0 0.0 0.0
1983 8211 0.0 0.0 0.0
1984 8577 0.0 0.0 0.0
1985 5325 0.0 0.0 0.0
1987 1770 0.0 0.0 0.0
1989 840 0.0 0.0 0.0
1990 3789 0.0 0.0 0.0
1991 2108 0.0 0.0 0.0

For data sources see[5]

References