X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304210110000

Well Details

Well ID: 0304210110000
Loading map...
Location: 00/10-01-030-21W4/0
Location Alias: 00/10-01-30-21 W4M
Location Alias 2: 00/10-01-030-21 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 21
Section: 01
County/Municipality: Starland County
Well Name: WEST DRUMHELLER NO 10-1
Operator Name: Gulf Canada Limited
License Number: 0006462
License Date: 1953-05-20
License Status: RecCertified
Spud Date: 1953-06-30
Final Drill Date: 1953-07-29
Well Total Depth: 1703.80 m
Surface Hole Latitude: 51.541399
Surface Hole Longitude: -112.826477

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-05-20 Obtained License
1953-07-29 Finished Drilling
1953-07-29 Well Mode changed to Drilled and Cased
1953-07-31 Perforation Treatment Performed - Open-Hole Completion
1953-07-31 Production Casing Operation Performed
1953-08-04 Well Began Production
1953-08-04 Well Fluid changed to Crude Oil
1953-08-04 Well Mode changed to Flowing
1973-08-11 Well Fluid changed to Crude Oil
1973-08-11 Well Mode changed to Pumping
1979-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-31 Perforation Treatment Performed - Cement Plug
1983-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-01 Perforation Treatment Performed - Jet Perforation
1983-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-07 Perforation Treatment Performed - Cement Squeeze
1986-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-11 Perforation Treatment Performed - Jet Perforation
1991-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-12-04 Perforation Treatment Performed - Jet Perforation
1991-12-04 Perforation Treatment Performed - Remedial Casing
1991-12-04 Plug Back Performed
1991-12-04 Well Fluid changed to Crude Oil
1991-12-04 Well Mode changed to Abandoned
1992-04-07 Perforation Treatment Performed - Jet Perforation
1992-04-08 Perforation Treatment Performed - Remedial Casing
1992-04-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-07-31 Open Hole/Barefoot Completion 1697.70 1703.80 0
1991-12-04 Packing Device Capped w/Cement 1672.00 1680.00 0
1991-12-04 Perforation 315.00 315.50 13
1991-12-04 Remedial Casing Cementing 315.00 315.50 0
1992-04-07 Perforation 100.00 100.50 7
1992-04-08 Remedial Casing Cementing 100.00 100.50 0
1979-06-15 Acid Treatment 1697.70 1703.80 0
1983-05-31 Cement Plug 1695.50 1703.80 0
1983-06-01 Perforation 1691.00 1692.90 13
1983-06-01 Acid Treatment 1691.00 1692.90 0
1983-06-02 Acid Treatment 1691.00 1692.90 0
1986-06-07 Cement Squeeze 1691.00 1692.90 0
1986-06-11 Perforation 1689.20 1690.10 13
1986-06-11 Acid Treatment 1689.20 1690.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 6478 0.0 0.0 0.0
1974 6951 0.0 0.0 0.0
1975 8126 0.0 0.0 0.0
1976 6646 0.0 0.0 0.0
1977 8597 0.0 0.0 0.0
1978 7658 0.0 0.0 0.0
1979 6716 0.0 0.0 0.0
1980 7830 0.0 0.0 0.0
1981 7120 0.0 0.0 0.0
1982 7188 0.0 0.0 0.0
1983 8040 0.0 0.0 0.0
1984 8158 0.0 0.0 0.0
1985 3103 0.0 0.0 0.0
1986 4582 0.0 0.0 0.0
1987 6360 0.0 0.0 0.0
1988 7972 0.0 0.0 0.0
1989 8440 0.0 0.0 0.0
1990 8348 0.0 0.0 0.0
1991 5732 0.0 0.0 0.0

For data sources see[5]

References