X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304210106023

Well Details

Well ID: 0304210106023
Loading map...
Location: 02/06-01-030-21W4/3
Location Alias: 02/06-01-30-21 W4M
Location Alias 2: 02/06-01-030-21 W4/03
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 21
Section: 01
County/Municipality: Starland County
Well Name: BEARSPAW ET AL 102 DRUMW 6-1-30-21
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0009305
License Date: 1955-03-18
License Status: Issued
Spud Date: 1955-03-29
Final Drill Date: 1955-04-17
Well Total Depth: 1724.60 m
Surface Hole Latitude: 51.537729
Surface Hole Longitude: -112.832964

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-03-18 Obtained License
1955-04-17 Finished Drilling
1955-04-17 Well Mode changed to Drilled and Cased
1955-04-18 Perforation Treatment Performed - Open-Hole Completion
1955-04-18 Production Casing Operation Performed
1977-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-12 Perforation Treatment Performed - Jet Perforation
1977-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-18 Plug Back Performed
1989-07-18 Well Log Performed
1989-07-19 Perforation Treatment Performed - Jet Perforation
1989-07-19 Well Log Performed
1989-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-22 Well Began Production
1989-07-22 Well Fluid changed to Crude Oil
1989-07-22 Well Mode changed to Pumping
1989-09-01 Well Fluid changed to Crude Oil
1989-09-01 Well Mode changed to Suspended
1990-04-19 Perforation Treatment Performed - Jet Perforation
1990-04-20 Perforation Treatment Performed - Cement Squeeze
1990-04-24 Perforation Treatment Performed - Jet Perforation
1990-04-27 Well Fluid changed to Crude Oil
1990-04-27 Well Mode changed to Pumping
1990-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-16 Well Fluid changed to Crude Oil
1990-05-16 Well Mode changed to Suspended
1998-10-27 Well Fluid changed to Crude Oil
1998-10-27 Well Mode changed to Pumping
2012-05-22 Liner Casing Operation Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-04-18 Open Hole/Barefoot Completion 1720.60 1724.60 0
1990-04-20 Cement Squeeze 1689.70 1698.00 0
1990-04-24 Perforation 1694.20 1696.00 13
1990-05-11 Acid Treatment 1694.20 1696.00 0
1977-10-12 Packing Device Capped w/Cement 1719.10 1719.10 0
1977-10-12 Perforation 1713.30 1714.80 7
1977-10-13 Acid Treatment 1713.30 1714.80 0
1979-01-18 Acid Treatment 1713.30 1714.80 0
1989-07-18 Packing Device Capped w/Cement 1700.00 1708.00 0
1989-07-19 Perforation 1689.70 1690.70 13
1989-07-20 Acid Treatment 1689.70 1690.70 0
1990-04-19 Perforation 1697.50 1698.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 176 0.0 0.0 0.0
1990 464 0.0 0.0 0.0
1998 1572 0.0 0.0 0.0
1999 780 0.0 0.0 0.0
2008 68 0.0 0.0 0.0
2009 4310 0.0 0.0 0.0
2010 6461 0.0 0.0 0.0
2011 5381 0.0 0.0 0.0
2012 3638 0.0 0.0 0.0
2013 5956 0.0 0.0 0.0
2014 3007 0.0 0.0 0.0
2015 7269 0.0 0.0 0.0
2016 1648 0.0 0.0 0.0
2017 7896 0.0 0.0 0.0
2018 6233 0.0 0.0 0.0
2019 3981 0.0 0.0 0.0
2020 1101 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References