X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304210105020

Well Details

Well ID: 0304210105020
Loading map...
Location: 02/05-01-030-21W4/0
Location Alias: 02/05-01-30-21 W4M
Location Alias 2: 02/05-01-030-21 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 21
Section: 01
County/Municipality: Starland County
Well Name: BEARSPAW ET AL 102 DRUMW 5-1-30-21
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0007446
License Date: 1953-12-10
License Status: Issued
Spud Date: 1953-12-09
Final Drill Date: 1954-01-06
Well Total Depth: 1720.00 m
Surface Hole Latitude: 51.537933
Surface Hole Longitude: -112.838289

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-10 Obtained License
1954-01-06 Finished Drilling
1954-01-06 Well Mode changed to Drilled and Cased
1954-01-07 Liner Casing Operation Performed
1954-01-07 Perforation Treatment Performed - Open-Hole Completion
1954-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-01-12 Perforation Treatment Performed - Acid Wash - No Pressure
1954-01-26 Drill Stem Test Performed
1954-01-31 Perforation Treatment Performed - Open-Hole Completion
1954-02-04 Well Began Production
1954-02-04 Well Fluid changed to Crude Oil
1954-02-04 Well Mode changed to Flowing
1959-12-01 Perforation Treatment Performed - Jet Perforation
1959-12-01 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1959-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-05-28 Well Fluid changed to Crude Oil
1973-05-28 Well Mode changed to Pumping
1997-03-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-01-07 Open Hole/Barefoot Completion 1702.60 1715.40 0
1954-01-12 Acid Treatment 1702.60 1715.40 0
1954-01-12 Acid Wash 1702.60 1715.40 0
1954-01-31 Open Hole/Barefoot Completion 1716.00 1720.00 0
1959-12-01 Resin-Gypsum Squeeze or Plug 1703.80 1705.40 0
1959-12-01 Perforation 1700.20 1701.70 10
1959-12-03 Acid Treatment 1700.20 1701.70 0
1959-12-04 Acid Treatment 1700.20 1701.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7098 0.0 0.0 0.0
1968 6480 0.0 0.0 0.0
1969 5428 0.0 0.0 0.0
1970 5174 0.0 0.0 0.0
1971 6040 0.0 0.0 0.0
1972 6735 0.0 0.0 0.0
1973 7420 0.0 0.0 0.0
1974 6524 0.0 0.0 0.0
1975 6862 0.0 0.0 0.0
1976 5492 0.0 0.0 0.0
1977 6220 0.0 0.0 0.0
1978 7515 0.0 0.0 0.0
1979 8500 0.0 0.0 0.0
1980 8415 0.0 0.0 0.0
1981 6411 0.0 0.0 0.0
1982 8017 0.0 0.0 0.0
1983 7886 0.0 0.0 0.0
1984 8676 0.0 0.0 0.0
1985 8582 0.0 0.0 0.0
1986 8404 0.0 0.0 0.0
1987 8734 0.0 0.0 0.0
1988 8604 0.0 0.0 0.0
1989 8577 0.0 0.0 0.0
1990 8316 0.0 0.0 0.0
1991 8368 0.0 0.0 0.0
1992 8519 0.0 0.0 0.0
1993 8350 0.0 0.0 0.0
1994 8122 0.0 0.0 0.0
1995 841 0.0 0.0 0.0
1997 3408 0.0 0.0 0.0
1998 8141 0.0 0.0 0.0
1999 8626 0.0 0.0 0.0
2000 8768 0.0 0.0 0.0
2001 8707 0.0 0.0 0.0
2002 7141 0.0 0.0 0.0
2003 4058 0.0 0.0 0.0
2004 6582 0.0 0.0 0.0
2005 6726 0.0 0.0 0.0
2006 8633 0.0 0.0 0.0
2007 5356 0.0 0.0 0.0
2008 5885 0.0 0.0 0.0
2009 8549 0.0 0.0 0.0
2010 5898 0.0 0.0 0.0
2011 8299 0.0 0.0 0.0
2012 8477 0.0 0.0 0.0
2013 8529 0.0 0.0 0.0
2014 8424 0.0 0.0 0.0
2015 8454 0.0 0.0 0.0
2016 8375 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 8085 0.0 0.0 0.0
2019 8402 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References