X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304203507000

Well Details

Well ID: 0304203507000
Loading map...
Location: 00/07-35-030-20W4/0
Location Alias: 00/07-35-30-20 W4M
Location Alias 2: 00/07-35-030-20 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 20
Section: 35
County/Municipality: Starland County
Well Name: GULF PINE UNIT DRUM 7-35-30-20
Operator Name: Pine Cliff Energy Ltd.
License Number: 0051412
License Date: 1974-10-08
License Status: Abandoned
Spud Date: 1974-10-16
Final Drill Date: 1974-10-22
Well Total Depth: 1391.40 m
Surface Hole Latitude: 51.610728
Surface Hole Longitude: -112.708656

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-10-08 Obtained License
1974-10-22 Drill Stem Test Performed
1974-10-22 Finished Drilling
1974-10-22 Well Mode changed to Drilled and Cased
1974-10-23 Drill Stem Test Performed
1974-10-25 Production Casing Operation Performed
1974-11-28 Perforation Treatment Performed - Jet Perforation
1974-12-02 Well Began Production
1974-12-02 Well Fluid changed to Crude Oil
1974-12-02 Well Mode changed to Flowing
1975-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-12 Perforation Treatment Performed - Jet Perforation
1975-08-12 Well Fluid changed to Crude Oil
1975-08-12 Well Mode changed to Flowing
1975-11-01 Well Fluid changed to Crude Oil
1975-11-01 Well Mode changed to Suspended
1976-06-09 Perforation Treatment Performed - Fractured
1986-11-10 Well Log Performed
1986-11-11 Perforation Treatment Performed - Jet Perforation
2006-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-01 Plug Back Performed
2006-02-01 Well Fluid changed to Crude Oil
2006-02-01 Well Mode changed to Abandoned Zone
2006-02-02 Perforation Treatment Performed - Jet Perforation
2014-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-08-23 Perforation Treatment Performed - Jet Perforation
2014-08-23 Plug Back Performed
2014-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-08-25 Perforation Treatment Performed - Remedial Casing
2014-08-25 Plug Back Performed
2014-08-26 Perforation Treatment Performed - Jet Perforation
2014-08-27 Perforation Treatment Performed - Jet Perforation
2014-08-27 Perforation Treatment Performed - Remedial Casing
2014-09-03 Perforation Treatment Performed - Remedial Casing
2014-09-03 Well Log Performed
2014-09-04 Perforation Treatment Performed - Jet Perforation
2014-09-05 Perforation Treatment Performed - Remedial Casing
2015-01-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-11-28 Perforation 1321.60 1324.70 13
2014-08-25 Remedial Casing Cementing 741.90 742.90 0
2014-08-25 Packing Device Capped w/Cement 724.00 733.00 0
2014-08-26 Perforation 596.50 597.50 13
2014-08-27 Remedial Casing Cementing 596.50 597.50 0
2014-08-27 Perforation 357.00 358.00 13
2014-09-03 Remedial Casing Cementing 357.00 358.00 0
2014-09-04 Perforation 217.40 218.40 13
2014-09-05 Remedial Casing Cementing 217.40 218.40 0
1975-06-07 Acid Treatment 1321.60 1324.70 0
1975-08-12 Perforation 1332.30 1335.00 13
1976-06-09 Fracture 1321.60 1324.70 0
1986-11-11 Perforation 1335.00 1341.10 13
2006-02-01 Packing Device Capped w/Cement 1309.80 1318.20 0
2006-02-02 Perforation 1146.50 1148.00 17
2014-08-23 Packing Device Capped w/Cement 1132.00 1140.00 0
2014-08-23 Perforation 741.90 742.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 39 0.0 0.0 0.0
1975 292 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References