X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304181604000

Well Details

Well ID: 0304181604000
Loading map...
Location: 00/04-16-030-18W4/0
Location Alias: 00/04-16-30-18 W4M
Location Alias 2: 00/04-16-030-18 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 18
Section: 16
County/Municipality: Starland County
Well Name: MARQUEE HZ MICHI 4-16-30-18
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0475806
License Date: 2015-06-17
License Status: Issued
Spud Date: 2015-07-02
Final Drill Date: 2015-07-16
Well Total Depth: 3003.00 m
Surface Hole Latitude: 51.565373
Surface Hole Longitude: -112.463022

For data sources see[1][2]

Well History

Date Event
2015-06-17 Obtained License
2015-07-03 Surface Casing Operation Performed
2015-07-05 Direction Drilling Operation Performed - Deviate
2015-07-07 Direction Drilling Operation Performed - Horizontal
2015-07-08 Intermediate Casing Operation Performed
2015-07-08 Well Log Performed
2015-07-15 Well Log Performed
2015-07-16 Finished Drilling
2015-07-16 Well Log Performed
2015-07-16 Well Mode changed to Drilled and Cased
2015-07-18 Liner Casing Operation Performed
2015-07-19 Rig Released
2015-07-22 Well Log Performed
2015-07-30 Perforation Treatment Performed - Jet Perforation
2015-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-17 Well Began Production
2015-08-17 Well Fluid changed to Crude Oil
2015-08-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-02 Bonanza Drilling Inc. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-05 1026.00 Deviate (5 - 79 degrees)
2015-07-07 1553.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-07-30 Perforation 2933.10 2933.20 20
2015-07-30 Multi-Stage Fracture 2510.10 2510.20 0
2015-07-30 Perforation 2396.20 2396.30 20
2015-07-30 Multi-Stage Fracture 2396.20 2396.30 0
2015-07-30 Perforation 2294.10 2294.20 20
2015-07-30 Multi-Stage Fracture 2294.10 2294.20 0
2015-07-30 Perforation 2204.10 2204.20 20
2015-07-30 Multi-Stage Fracture 2204.10 2204.20 0
2015-07-30 Perforation 2128.30 2128.40 20
2015-07-30 Multi-Stage Fracture 2128.30 2128.40 0
2015-07-30 Perforation 2051.50 2051.60 20
2015-07-30 Multi-Stage Fracture 2933.10 2933.20 0
2015-07-30 Multi-Stage Fracture 2051.50 2051.60 0
2015-07-30 Perforation 1973.80 1973.90 20
2015-07-30 Multi-Stage Fracture 1973.80 1973.90 0
2015-07-30 Perforation 1897.10 1897.20 20
2015-07-30 Multi-Stage Fracture 1897.10 1897.20 0
2015-07-30 Perforation 1807.70 1807.80 20
2015-07-30 Multi-Stage Fracture 1807.70 1807.80 0
2015-07-30 Perforation 1717.90 1718.00 20
2015-07-30 Multi-Stage Fracture 1717.90 1718.00 0
2015-07-30 Perforation 1640.90 1641.00 20
2015-07-30 Perforation 2855.10 2855.20 20
2015-07-30 Multi-Stage Fracture 1640.90 1641.00 0
2015-07-30 Multi-Stage Fracture 2855.10 2855.20 0
2015-07-30 Perforation 2740.10 2740.20 20
2015-07-30 Multi-Stage Fracture 2740.10 2740.20 0
2015-07-30 Perforation 2626.10 2626.20 20
2015-07-30 Multi-Stage Fracture 2626.10 2626.20 0
2015-07-30 Perforation 2510.10 2510.20 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-30 2015-07-30 1,346 1,503 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 79.5756 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 1.6648 N/A
Crystalline silica. quartz 14808-60-7 100 1.6648 N/A
Iron Oxide 1309-37-1 100 1.6648 N/A
Titanium Oxide 13463-67-7 100 1.6647 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 16.6485 N/A
Crystalline silica. quartz 14808-60-7 100 16.6485 N/A
Iron Oxide 1309-37-1 100 16.6485 N/A
Titanium Oxide 13463-67-7 100 16.6485 N/A
HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 1.1378 N/A
Water 7732-18-5 100 1.1378 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0102 N/A
Water 7732-18-5 100 0.0102 N/A
CAN-2300 Breaker (Enzyme HpH. 10L:1L) Canyon Breaker Cellulase Enzyme Solution Not Available 100 0.0052 N/A
Water 7732-18-5 100 0.0052 N/A
CAN-2301 Breaker (Oxidizer) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0433 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0433 N/A
CAN-1636 pH Buffer (LpH) Canyon Buffer Acetic Acid 64-19-7 100 0.0173 N/A
Water 7732-18-5 100 0.0173 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.16 N/A
Water 7732-18-5 100 0.16 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.1994 N/A
Monoethanolamine 141-43-5 100 0.1994 N/A
Water 7732-18-5 100 0.1994 N/A
CAN-2411 Non-emulsifier Canyon Demulsifier Ethylene glycol 107-21-1 100 0.0743 N/A
Isopropanol 67-63-0 100 0.0743 N/A
Water 7732-18-5 100 0.0743 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.4629 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-22 2015-07-24 Surface Water - Lake 1450

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3277 0.0 0.0 0.0
2016 8351 0.0 0.0 0.0
2017 8534 0.0 0.0 0.0
2018 8191 0.0 0.0 0.0
2019 7484 0.0 0.0 0.0
2020 1957 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-19 No Incident Encountered 0.00 0.00
2015-08-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References