If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304123312002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.613961,"lon":-111.641555,"icon":""}]} |
Location: 00/12-33-030-12W4/2 | |
Location Alias: 00/12-33-30-12 W4M | |
Location Alias 2: 00/12-33-030-12 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 12 | |
Section: 33 | |
County/Municipality: Special Areas No. 2 | |
Well Name: RENAISSANCE ET AL RDALE 12-33-30-12 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0156094 | |
License Date: 1993-01-29 | |
License Status: Abandoned | |
Spud Date: 1993-02-05 | |
Final Drill Date: 1993-02-08 | |
Well Total Depth: 1120.00 m | |
Surface Hole Latitude: 51.613961 | |
Surface Hole Longitude: -111.641555 |
Date | Event |
---|---|
1993-01-29 | Obtained License |
1993-02-06 | Surface Casing Operation Performed |
1993-02-08 | Drill Stem Test Performed |
1993-02-08 | Finished Drilling |
1993-02-08 | Well Log Performed |
1993-02-08 | Well Mode changed to Drilled and Cased |
1993-02-09 | Drill Stem Test Performed |
1993-02-10 | Production Casing Operation Performed |
1993-02-10 | Rig Released |
1993-02-19 | Perforation Treatment Performed - Jet Perforation |
1994-05-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-05-03 | Perforation Treatment Performed - Jet Perforation |
1994-05-03 | Plug Back Performed |
1996-04-29 | Well Began Production |
1996-04-29 | Well Fluid changed to Gas |
1996-04-29 | Well Mode changed to Flowing |
1996-12-01 | Well Fluid changed to Gas |
1996-12-01 | Well Mode changed to Suspended |
2010-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-12 | Plug Back Performed |
2010-08-12 | Well Fluid changed to Gas |
2010-08-12 | Well Mode changed to Abandoned Zone |
2010-08-13 | Well Abandoned |
2010-08-13 | Well Fluid changed to Gas |
2010-08-13 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-02-19 | Perforation | 1072.00 | 1074.00 | 13 |
1994-05-03 | Packing Device Capped w/Cement | 1059.00 | 1067.00 | 0 |
1994-05-03 | Perforation | 981.00 | 983.00 | 13 |
1994-05-03 | Perforation | 987.00 | 988.00 | 13 |
2010-08-12 | Packing Device Capped w/Cement | 967.00 | 975.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3900 | 0.0 | 0.0 | 0.0 |
2001 | 2695 | 0.0 | 0.0 | 0.0 |
2002 | 888 | 0.0 | 0.0 | 0.0 |
For data sources see[5]