X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304051116002

Well Details

Well ID: 0304051116002
Loading map...
Location: 00/16-11-030-05W4/2
Location Alias: 00/16-11-30-05 W4M
Location Alias 2: 00/16-11-030-05 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 05
Section: 11
County/Municipality: Special Areas No. 3
Well Name: ATCO ET AL SEDALIA 16-11-30-5
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0077289
License Date: 1979-08-03
License Status: RecCertified
Spud Date: 1979-08-10
Final Drill Date: 1979-08-13
Well Total Depth: 866.00 m
Surface Hole Latitude: 51.558614
Surface Hole Longitude: -110.595773

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-03 Obtained License
1979-08-13 Finished Drilling
1979-08-13 Well Mode changed to Drilled and Cased
1979-08-14 Production Casing Operation Performed
1979-09-14 Perforation Treatment Performed - Jet Perforation
1979-09-17 Perforation Treatment Performed - Cement Squeeze
1979-09-19 Perforation Treatment Performed - Jet Perforation
1979-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-23 Perforation Treatment Performed - Fractured
1979-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-05 Perforation Treatment Performed - Jet Perforation
1979-11-20 Well Began Production
1979-11-20 Well Fluid changed to Gas
1979-11-20 Well Mode changed to Flowing
1980-05-20 Perforation Treatment Performed - Fractured
1993-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-13 Plug Back Performed
1993-08-13 Well Abandoned
1993-08-13 Well Fluid changed to Gas
1993-08-13 Well Mode changed to Abandoned
1993-10-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-14 Perforation 856.50 858.00 6
1980-05-20 Fracture 757.00 757.90 0
1993-08-13 Packing Device Capped w/Cement 827.00 835.00 0
1993-08-13 Packing Device Capped w/Cement 744.00 752.00 0
1979-09-17 Cement Squeeze 856.50 858.00 0
1979-09-19 Perforation 846.50 848.50 6
1979-09-20 Acid Treatment 846.50 848.50 0
1979-09-23 Fracture 846.50 848.50 0
1979-10-29 Acid Treatment 846.50 848.50 0
1979-11-05 Perforation 757.00 757.30 10
1979-11-05 Perforation 757.40 757.60 10
1979-11-05 Perforation 757.70 757.90 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 978 0.0 0.0 0.0
1980 5972 0.0 0.0 0.0
1981 5458 0.0 0.0 0.0
1982 6146 0.0 0.0 0.0
1983 3525 0.0 0.0 0.0
1984 3093 0.0 0.0 0.0
1985 6001 0.0 0.0 0.0
1986 8301 0.0 0.0 0.0
1987 7919 0.0 0.0 0.0
1988 7789 0.0 0.0 0.0
1989 8550 0.0 0.0 0.0
1990 4200 0.0 0.0 0.0

For data sources see[5]

References