X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304050211000

Well Details

Well ID: 0304050211000
Loading map...
Location: 00/11-02-030-05W4/0
Location Alias: 00/11-02-30-05 W4M
Location Alias 2: 00/11-02-030-05 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 05
Section: 02
County/Municipality: Special Areas No. 3
Well Name: ATCO ET AL SEDALIA 11-2-30-5
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0060031
License Date: 1976-09-02
License Status: RecCertified
Spud Date: 1976-09-05
Final Drill Date: 1976-09-08
Well Total Depth: 887.00 m
Surface Hole Latitude: 51.540448
Surface Hole Longitude: -110.607305

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-02 Obtained License
1976-09-08 Finished Drilling
1976-09-08 Well Mode changed to Drilled and Cased
1976-09-09 Production Casing Operation Performed
1976-09-16 Perforation Treatment Performed - Jet Perforation
1976-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-01 Well Began Production
1976-11-01 Well Fluid changed to Gas
1976-11-01 Well Mode changed to Flowing
1980-09-14 Perforation Treatment Performed - Cement Squeeze
1980-09-16 Perforation Treatment Performed - Casing Patch (Over Perfs)
1980-09-17 Perforation Treatment Performed - Jet Perforation
1980-09-17 Well Fluid changed to Gas
1980-09-17 Well Mode changed to Abandoned Zone
1980-09-24 Perforation Treatment Performed - Fractured
1988-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-12 Plug Back Performed
1988-03-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-16 Perforation 753.80 755.60 13
1976-09-19 Acid Treatment 753.80 755.60 0
1980-09-14 Cement Squeeze 753.80 755.60 0
1980-09-16 Casing Patch 753.80 755.60 0
1980-09-17 Perforation 846.10 847.90 7
1980-09-17 Perforation 849.70 852.80 3
1980-09-24 Fracture 846.10 852.80 0
1988-03-12 Packing Device Capped w/Cement 838.00 848.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 236 0.0 0.0 0.0
1977 4272 0.0 0.0 0.0
1978 4921 0.0 0.0 0.0
1979 5272 0.0 0.0 0.0
1980 3243 0.0 0.0 0.0

For data sources see[5]

References