X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304012816003

Well Details

Well ID: 0304012816003
Loading map...
Location: 00/16-28-030-01W4/3
Location Alias: 00/16-28-30-01 W4M
Location Alias 2: 00/16-28-030-01 W4/03
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 01
Section: 28
County/Municipality: Special Areas No. 3
Well Name: PENN WEST ANTELOPE 16-28-30-1
Operator Name: Obsidian Energy Ltd.
License Number: 0238367
License Date: 2000-06-09
License Status: Suspension
Spud Date: 2000-06-14
Final Drill Date: 2000-06-17
Well Total Depth: 883.00 m
Surface Hole Latitude: 51.602167
Surface Hole Longitude: -110.076046

For data sources see[1][2]

Well History

Date Event
2000-06-09 Obtained License
2000-06-15 Surface Casing Operation Performed
2000-06-17 Finished Drilling
2000-06-17 Well Log Performed
2000-06-17 Well Mode changed to Drilled and Cased
2000-06-18 Production Casing Operation Performed
2000-06-18 Rig Released
2000-07-04 Perforation Treatment Performed - Jet Perforation
2000-07-04 Well Log Performed
2000-08-19 Perforation Treatment Performed - Jet Perforation
2000-08-19 Well Log Performed
2004-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-20 Perforation Treatment Performed - Cement Squeeze
2004-11-20 Plug Back Performed
2004-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-21 Perforation Treatment Performed - Cement Squeeze
2004-11-21 Plug Back Performed
2004-11-22 Perforation Treatment Performed - Jet Perforation
2004-11-22 Well Log Performed
2005-02-07 Well Began Production
2005-02-07 Well Fluid changed to Gas
2005-02-07 Well Mode changed to Flowing
2018-12-31 Well Fluid changed to Gas
2018-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-07-04 Perforation 841.30 842.40 20
2000-08-19 Perforation 756.30 757.50 17
2004-11-20 Cement Squeeze 841.30 842.40 0
2004-11-20 Packing Device Capped w/Cement 823.50 831.50 0
2004-11-21 Cement Squeeze 756.30 757.50 0
2004-11-21 Packing Device Capped w/Cement 740.50 750.00 0
2004-11-22 Perforation 713.00 714.20 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7034 0.0 0.0 0.0
2006 7365 0.0 0.0 0.0
2007 4050 0.0 0.0 0.0
2008 8199 0.0 0.0 0.0
2009 8472 0.0 0.0 0.0
2010 8282 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8346 0.0 0.0 0.0
2013 8633 0.0 0.0 0.0
2014 8572 0.0 0.0 0.0
2015 7942 0.0 0.0 0.0
2016 7881 0.0 0.0 0.0
2017 6103 0.0 0.0 0.0
2018 6953 0.0 0.0 0.0

For data sources see[5]

References