X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304012802002

Well Details

Well ID: 0304012802002
Loading map...
Location: 00/02-28-030-01W4/2
Location Alias: 00/02-28-30-01 W4M
Location Alias 2: 00/02-28-030-01 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 01
Section: 28
County/Municipality: Special Areas No. 3
Well Name: OLY ET AL ANTELOPE 2-28-30-1
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0134012
License Date: 1988-05-24
License Status: RecCertified
Spud Date: 1988-05-25
Final Drill Date: 1988-05-28
Well Total Depth: 893.00 m
Surface Hole Latitude: 51.593983
Surface Hole Longitude: -110.083304

For data sources see[1][2]

Well History

Date Event
1988-05-24 Obtained License
1988-05-25 Lost Circulation Occurred
1988-05-26 Surface Casing Operation Performed
1988-05-28 Finished Drilling
1988-05-28 Well Log Performed
1988-05-28 Well Mode changed to Drilled and Cased
1988-05-29 Drill Stem Test Performed
1988-05-30 Drill Stem Test Performed
1988-05-30 Production Casing Operation Performed
1988-05-31 Rig Released
1988-06-30 Well Log Performed
1988-07-17 Well Log Performed
1988-07-18 Perforation Treatment Performed - Jet Perforation
1988-07-26 Well Log Performed
1988-07-27 Perforation Treatment Performed - Jet Perforation
1988-11-19 Well Began Production
1988-11-19 Well Fluid changed to Gas
1988-11-19 Well Mode changed to Flowing
1989-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-12 Perforation Treatment Performed - Jet Perforation
1989-10-12 Plug Back Performed
1989-10-12 Well Fluid changed to Gas
1989-10-12 Well Log Performed
1989-10-12 Well Mode changed to Abandoned Zone
1992-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-23 Plug Back Performed
1992-10-23 Well Log Performed
1992-10-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-18 Perforation 854.00 855.20 13
1988-07-27 Perforation 805.50 806.50 13
1988-07-27 Perforation 807.80 811.00 13
1989-10-12 Packing Device Capped w/Cement 842.00 850.00 0
1989-10-12 Packing Device Capped w/Cement 794.00 802.00 0
1989-10-12 Perforation 765.00 766.50 13
1992-10-23 Packing Device Capped w/Cement 750.00 758.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 208 0.0 0.0 0.0
1989 5954 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-05-25 Lost Circulation 156.00 156.00

For data sources see[6]

References