X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304012307000

Well Details

Well ID: 0304012307000
Loading map...
Location: 00/07-23-030-01W4/0
Location Alias: 00/07-23-30-01 W4M
Location Alias 2: 00/07-23-030-01 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 01
Section: 23
County/Municipality: Special Areas No. 3
Well Name: PENN WEST ANTELOPE 7-23-30-1
Operator Name: Obsidian Energy Ltd.
License Number: 0271881
License Date: 2002-07-17
License Status: Suspension
Spud Date: 2002-08-24
Final Drill Date: 2002-08-26
Well Total Depth: 915.00 m
Surface Hole Latitude: 51.580180
Surface Hole Longitude: -110.037755

For data sources see[1][2]

Well History

Date Event
2001-09-18 Well Log Performed
2002-07-17 Obtained License
2002-08-25 Surface Casing Operation Performed
2002-08-26 Finished Drilling
2002-08-26 Well Log Performed
2002-08-27 Production Casing Operation Performed
2002-08-27 Rig Released
2002-08-27 Well Mode changed to Drilled and Cased
2002-09-19 Well Log Performed
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-12-01 Well Began Production
2002-12-01 Well Fluid changed to Gas
2002-12-01 Well Mode changed to Flowing
2008-09-16 Well Log Performed
2008-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-18 Perforation Treatment Performed - Jet Perforation
2008-09-18 Perforation Treatment Performed - Remedial Casing
2008-09-18 Plug Back Performed
2008-09-18 Well Fluid changed to Gas
2008-09-18 Well Mode changed to Abandoned Zone
2008-09-25 Perforation Treatment Performed - Jet Perforation
2008-09-25 Well Log Performed
2008-09-28 Perforation Treatment Performed - Casing Patch (Over Perfs)
2008-09-28 Perforation Treatment Performed - Jet Perforation
2008-09-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-20 Perforation 865.30 866.40 17
2008-09-18 Packing Device Capped w/Cement 852.20 860.20 0
2008-09-18 Perforation 396.00 401.00 13
2008-09-18 Acid Treatment 396.00 401.00 0
2008-09-18 Remedial Casing Cementing 396.00 401.00 0
2008-09-25 Perforation 830.80 832.80 17
2008-09-25 Perforation 833.70 836.00 17
2008-09-28 Perforation 396.00 401.00 13
2008-09-28 Casing Patch 396.00 401.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 590 0.0 0.0 0.0
2003 8232 0.0 0.0 0.0
2004 8216 0.0 0.0 0.0
2005 5824 0.0 0.0 0.0
2006 4475 0.0 0.0 0.0

For data sources see[5]

References