X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304011707000

Well Details

Well ID: 0304011707000
Loading map...
Location: 00/07-17-030-01W4/0
Location Alias: 00/07-17-30-01 W4M
Location Alias 2: 00/07-17-030-01 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 01
Section: 17
County/Municipality: Special Areas No. 3
Well Name: OAK ANTELOPE 7-17-30-1
Operator Name: Obsidian Energy Ltd.
License Number: 0036743
License Date: 1969-08-26
License Status: Suspension
Spud Date: 1969-10-26
Final Drill Date: 1969-10-30
Well Total Depth: 874.80 m
Surface Hole Latitude: 51.565787
Surface Hole Longitude: -110.106073

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-08-26 Obtained License
1969-10-29 Drill Stem Test Performed
1969-10-30 Drill Stem Test Performed
1969-10-30 Finished Drilling
1969-10-31 Well Log Performed
1969-11-01 Drill Stem Test Performed
1969-11-02 Production Casing Operation Performed
1970-10-29 Well Mode changed to Drilled and Cased
1972-12-08 Perforation Treatment Performed - Jet Perforation
1972-12-09 Perforation Treatment Performed - Jet Perforation
1973-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-12 Well Began Production
1976-08-12 Well Fluid changed to Gas
1976-08-12 Well Mode changed to Flowing
1999-04-30 Well Fluid changed to Gas
1999-04-30 Well Mode changed to Suspended
2001-08-10 Well Log Performed
2001-08-13 Well Log Performed
2001-08-15 Perforation Treatment Performed - Jet Perforation
2001-08-15 Well Log Performed
2001-08-23 Perforation Treatment Performed - Remedial Casing
2010-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-12-08 Perforation 754.40 756.50 13
1972-12-09 Perforation 743.70 746.20 13
1973-09-28 Acid Treatment 743.70 756.50 0
2001-08-15 Perforation 122.00 123.00 20
2001-08-23 Remedial Casing Cementing 122.00 123.00 0
2010-08-09 Packing Device Capped w/Cement 727.00 735.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3217 0.0 0.0 0.0
1977 7229 0.0 0.0 0.0
1978 7160 0.0 0.0 0.0
1979 6946 0.0 0.0 0.0
1980 8662 0.0 0.0 0.0
1981 7169 0.0 0.0 0.0
1982 6196 0.0 0.0 0.0
1983 5407 0.0 0.0 0.0
1984 5632 0.0 0.0 0.0
1985 5999 0.0 0.0 0.0
1986 6403 0.0 0.0 0.0
1987 5479 0.0 0.0 0.0
1988 5218 0.0 0.0 0.0
1989 4701 0.0 0.0 0.0
1990 5522 0.0 0.0 0.0
1991 6164 0.0 0.0 0.0
1992 6543 0.0 0.0 0.0
1993 8127 0.0 0.0 0.0
1994 375 0.0 0.0 0.0

For data sources see[5]

References