If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0295030210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.45532,"lon":-114.313682,"icon":""}]} |
Location: 00/10-02-029-03W5/0 | |
Location Alias: 00/10-02-29-03 W5M | |
Location Alias 2: 00/10-02-029-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 5 | |
Range: 03 | |
Section: 02 | |
County/Municipality: Mountain View County | |
Well Name: DOME ET AL CROSSFIELD 10-2-29-3 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0080474 | |
License Date: 1980-01-17 | |
License Status: Re-Entered | |
Spud Date: 1980-02-05 | |
Final Drill Date: 1980-03-16 | |
Well Total Depth: 2713.00 m | |
Surface Hole Latitude: 51.455320 | |
Surface Hole Longitude: -114.313682 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-01-17 | Obtained License |
1980-02-06 | Lost Circulation Occurred |
1980-03-16 | Finished Drilling |
1980-03-22 | Production Casing Operation Performed |
1980-05-02 | Perforation Treatment Performed - Jet Perforation |
1980-05-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-05-09 | Perforation Treatment Performed - Jet Perforation |
1980-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-05-14 | Perforation Treatment Performed - Fractured |
1980-05-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-05-17 | Well Abandoned |
1980-05-17 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-05-02 | Perforation | 2659.50 | 2663.00 | 13 |
1980-05-07 | Packing Device Capped w/Cement | 2632.00 | 2640.00 | 0 |
1980-05-09 | Perforation | 2248.00 | 2252.00 | 13 |
1980-05-11 | Acid Treatment | 2248.00 | 2252.00 | 0 |
1980-05-14 | Fracture | 2248.00 | 2252.00 | 0 |
1980-05-17 | Packing Device Capped w/Cement | 2222.00 | 2230.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-02-06 | Lost Circulation | 200.00 | 232.00 |
For data sources see[5]