X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295010207000

Well Details

Well ID: 0295010207000
Loading map...
Location: 00/07-02-029-01W5/0
Location Alias: 00/07-02-29-01 W5M
Location Alias 2: 00/07-02-029-01 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 01
Section: 02
County/Municipality: Rocky View County
Well Name: PWEI UNIT CROSSE 7-2-29-1
Operator Name: TAQA North Ltd.
License Number: 0031025
License Date: 1966-09-22
License Status: Abandoned
Spud Date: 1966-09-24
Final Drill Date: 1966-10-21
Well Total Depth: 2754.50 m
Surface Hole Latitude: 51.451143
Surface Hole Longitude: -114.033959

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-22 Obtained License
1966-10-21 Finished Drilling
1966-10-21 Production Casing Operation Performed
1966-10-22 Well Mode changed to Drilled and Cased
1966-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-12 Perforation Treatment Performed - Jet Perforation
1966-11-12 Perforation Treatment Performed - Nitrogen Treatment
1968-02-05 Well Began Production
1968-02-05 Well Fluid changed to Gas
1968-02-05 Well Mode changed to Flowing
1969-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-08 Perforation Treatment Performed - Cement Squeeze
1969-06-09 Perforation Treatment Performed - Cement Squeeze
1969-06-11 Perforation Treatment Performed - Jet Perforation
1969-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-20 Well Fluid changed to Gas
2006-12-20 Well Mode changed to Suspended
2019-02-15 Well Log Performed
2019-02-16 Well Log Performed
2019-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-19 Plug Back Performed
2019-02-19 Well Fluid changed to Gas
2019-02-19 Well Mode changed to Abandoned Zone
2019-02-20 Well Log Performed
2019-02-21 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-02-21 Perforation Treatment Performed - Jet Perforation
2019-02-21 Well Log Performed
2019-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-22 Plug Back Performed
2019-02-23 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-02-23 Perforation Treatment Performed - Jet Perforation
2019-02-23 Well Log Performed
2019-02-24 Perforation Treatment Performed - Jet Perforation
2019-02-24 Well Log Performed
2019-02-26 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-27 Plug Back Performed
2019-03-20 Well Abandoned
2019-03-20 Well Fluid changed to Gas
2019-03-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-11-12 Perforation 2701.70 2709.70 7
1969-06-18 Acid Treatment 2710.30 2711.50 0
1969-06-24 Acid Treatment 2710.30 2711.50 0
2019-02-19 Packing Device Capped w/Cement 2424.00 2674.00 0
2019-02-21 Bridge Plug, No Cement 1145.00 1145.30 0
2019-02-21 Perforation 1135.00 1137.00 17
2019-02-22 Packing Device Capped w/Cement 1095.00 1125.00 0
2019-02-23 Perforation 605.00 607.00 17
2019-02-23 Bridge Plug, No Cement 615.00 615.30 0
2019-02-23 Perforation 510.00 512.00 17
2019-02-23 Perforation 580.00 582.00 17
1966-11-12 Perforation 2715.20 2716.40 7
2019-02-24 Perforation 413.00 415.00 17
2019-02-24 Perforation 430.00 432.00 17
2019-02-24 Perforation 460.00 462.00 17
2019-02-26 Bridge Plug, No Cement 405.80 406.10 0
2019-02-27 Packing Device Capped w/Cement 372.00 402.00 0
1966-11-12 Perforation 2718.20 2721.90 7
1966-11-12 Acid Treatment 2701.70 2721.90 0
1966-11-12 Nitrogen Treatment 2701.70 2721.90 0
1969-06-08 Acid Treatment 2701.70 2721.90 0
1969-06-08 Cement Squeeze 2701.70 2721.90 0
1969-06-09 Cement Squeeze 2701.70 2721.90 0
1969-06-11 Perforation 2710.30 2711.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1968 1400 0.0 0.0 0.0
1969 5859 0.0 0.0 0.0
1970 7753 0.0 0.0 0.0
1971 7215 0.0 0.0 0.0
1972 8059 0.0 0.0 0.0
1973 8608 0.0 0.0 0.0
1974 7646 0.0 0.0 0.0
1975 8063 0.0 0.0 0.0
1976 7312 0.0 0.0 0.0
1977 7121 0.0 0.0 0.0
1978 6799 0.0 0.0 0.0
1979 5749 0.0 0.0 0.0
1980 1671 0.0 0.0 0.0
1981 7889 0.0 0.0 0.0
1982 7569 0.0 0.0 0.0
1983 8195 0.0 0.0 0.0
1984 7748 0.0 0.0 0.0
1985 8400 0.0 0.0 0.0
1986 7771 0.0 0.0 0.0
1987 8682 0.0 0.0 0.0
1988 7573 0.0 0.0 0.0
1989 8600 0.0 0.0 0.0
1990 8569 0.0 0.0 0.0
1991 8677 0.0 0.0 0.0
1992 8023 0.0 0.0 0.0
1993 5742 0.0 0.0 0.0
1994 5886 0.0 0.0 0.0
1995 4333 0.0 0.0 0.0
1996 34 0.0 0.0 0.0
1998 1031 0.0 0.0 0.0
1999 1850 0.0 0.0 0.0
2000 207 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-25 No Incident Encountered 0.00 0.00
2019-02-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References