X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294281213000

Well Details

Well ID: 0294281213000
Loading map...
Location: 00/13-12-029-28W4/0
Location Alias: 00/13-12-29-28 W4M
Location Alias 2: 00/13-12-029-28 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 28
Section: 12
County/Municipality: Mountain View County
Well Name: EMBER ENTICE 13-12-29-28
Operator Name: Ember Resources Inc.
License Number: 0410800
License Date: 2009-06-04
License Status: Amended
Spud Date: 2009-12-19
Final Drill Date: 2009-12-20
Well Total Depth: 1461.00 m
Surface Hole Latitude: 51.473259
Surface Hole Longitude: -113.808244

For data sources see[1][2]

Well History

Date Event
2009-06-04 Obtained License
2009-12-19 Surface Casing Operation Performed
2009-12-20 Direction Drilling Operation Performed - Deviate
2009-12-20 Finished Drilling
2009-12-20 Well Mode changed to Drilled and Cased
2009-12-21 Production Casing Operation Performed
2009-12-21 Rig Released
2010-01-21 Well Log Performed
2010-01-27 Well Log Performed
2010-02-26 Perforation Treatment Performed - Jet Perforation
2010-05-13 Perforation Treatment Performed - Jet Perforation
2010-05-18 Perforation Treatment Performed - Fractured
2010-06-07 Well Began Production
2010-06-07 Well Fluid changed to Coalbed Methane-Coals and Other
2010-06-07 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-20 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-26 Perforation 1319.00 1321.00 13
2010-05-13 Perforation 814.00 815.00 13
2010-05-13 Perforation 489.90 490.40 13
2010-05-13 Perforation 505.00 508.00 13
2010-05-13 Perforation 890.50 893.50 13
2010-05-13 Perforation 930.00 932.00 13
2010-05-13 Perforation 577.00 579.00 13
2010-05-13 Perforation 598.00 600.00 13
2010-05-13 Perforation 546.00 549.00 13
2010-05-13 Perforation 568.00 570.00 13
2010-05-13 Perforation 700.00 702.00 13
2010-02-26 Perforation 1271.00 1273.00 13
2010-05-13 Perforation 724.00 727.00 13
2010-05-13 Perforation 611.00 613.00 13
2010-05-13 Perforation 631.00 634.00 13
2010-05-13 Perforation 514.00 514.50 13
2010-05-13 Perforation 997.50 998.00 13
2010-05-13 Perforation 999.90 1000.40 13
2010-05-13 Perforation 992.80 993.30 13
2010-05-13 Perforation 995.30 995.80 13
2010-05-13 Perforation 1024.60 1025.10 13
2010-05-13 Perforation 1032.50 1033.00 13
2010-02-26 Perforation 976.00 979.00 13
2010-05-13 Perforation 1003.90 1005.90 13
2010-05-13 Perforation 1018.10 1019.10 13
2010-05-13 Perforation 970.60 971.10 13
2010-05-13 Perforation 673.10 673.60 13
2010-05-13 Perforation 646.70 647.20 13
2010-05-13 Perforation 521.70 522.20 13
2010-05-13 Perforation 682.70 683.70 13
2010-05-13 Perforation 836.70 837.70 13
2010-05-13 Perforation 952.80 953.80 13
2010-05-13 Perforation 806.70 807.20 13
2010-02-26 Perforation 1441.00 1443.00 13
2010-05-18 Fracture 489.90 1033.00 0
2010-02-26 Perforation 1396.00 1397.00 13
2010-02-26 Perforation 1355.00 1357.00 13
2010-05-13 Perforation 830.00 833.00 13
2010-05-13 Perforation 883.00 885.00 13
2010-05-13 Perforation 784.00 786.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4978 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8747 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8669 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8660 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[6]

References