If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294273616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.531654,"lon":-113.662484,"icon":""}]} |
Location: 00/16-36-029-27W4/0 | |
Location Alias: 00/16-36-29-27 W4M | |
Location Alias 2: 00/16-36-029-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL LPINECK 16-36-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423306 | |
License Date: 2010-09-08 | |
License Status: Issued | |
Spud Date: 2011-03-06 | |
Final Drill Date: 2011-03-06 | |
Well Total Depth: 1091.00 m | |
Surface Hole Latitude: 51.531654 | |
Surface Hole Longitude: -113.662484 |
Date | Event |
---|---|
2010-09-08 | Obtained License |
2011-01-17 | Surface Casing Operation Performed |
2011-03-06 | Finished Drilling |
2011-03-06 | Well Mode changed to Drilled and Cased |
2011-03-08 | Production Casing Operation Performed |
2011-03-09 | Rig Released |
2011-03-12 | Well Log Performed |
2011-09-20 | Perforation Treatment Performed - Jet Perforation |
2011-09-20 | Well Log Performed |
2011-10-26 | Perforation Treatment Performed - Fractured |
2011-11-04 | Well Began Production |
2011-11-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-20 | Perforation | 720.00 | 722.00 | 13 |
2011-09-20 | Perforation | 658.30 | 658.80 | 13 |
2011-09-20 | Perforation | 654.00 | 654.50 | 13 |
2011-09-20 | Perforation | 636.60 | 637.10 | 13 |
2011-09-20 | Perforation | 634.30 | 634.80 | 13 |
2011-09-20 | Perforation | 626.90 | 627.40 | 13 |
2011-09-20 | Perforation | 610.70 | 611.20 | 13 |
2011-09-20 | Perforation | 566.30 | 567.30 | 13 |
2011-09-20 | Perforation | 559.00 | 561.00 | 13 |
2011-09-20 | Perforation | 521.00 | 523.00 | 13 |
2011-09-20 | Perforation | 500.50 | 501.00 | 13 |
2011-09-20 | Perforation | 712.00 | 713.00 | 13 |
2011-09-20 | Perforation | 485.50 | 486.00 | 13 |
2011-09-20 | Perforation | 454.00 | 455.00 | 13 |
2011-09-20 | Perforation | 450.00 | 450.50 | 13 |
2011-09-20 | Perforation | 434.50 | 435.00 | 13 |
2011-09-20 | Perforation | 371.00 | 371.50 | 13 |
2011-09-20 | Perforation | 329.00 | 329.50 | 13 |
2011-09-20 | Perforation | 319.50 | 320.00 | 13 |
2011-09-20 | Perforation | 301.00 | 301.50 | 13 |
2011-10-26 | Fracture | 720.00 | 722.00 | 0 |
2011-10-26 | Fracture | 712.00 | 713.00 | 0 |
2011-09-20 | Perforation | 705.00 | 708.00 | 13 |
2011-10-26 | Fracture | 705.00 | 708.00 | 0 |
2011-10-26 | Fracture | 701.00 | 701.50 | 0 |
2011-10-26 | Fracture | 699.50 | 700.00 | 0 |
2011-10-26 | Fracture | 694.50 | 695.50 | 0 |
2011-10-26 | Fracture | 690.00 | 692.00 | 0 |
2011-10-26 | Fracture | 673.00 | 674.00 | 0 |
2011-10-26 | Fracture | 659.80 | 660.30 | 0 |
2011-10-26 | Fracture | 658.30 | 658.80 | 0 |
2011-10-26 | Fracture | 654.00 | 654.50 | 0 |
2011-10-26 | Fracture | 636.60 | 637.10 | 0 |
2011-09-20 | Perforation | 701.00 | 701.50 | 13 |
2011-10-26 | Fracture | 634.30 | 634.80 | 0 |
2011-10-26 | Fracture | 626.90 | 627.40 | 0 |
2011-10-26 | Fracture | 610.70 | 611.20 | 0 |
2011-10-26 | Fracture | 566.30 | 567.30 | 0 |
2011-10-26 | Fracture | 559.00 | 561.00 | 0 |
2011-10-26 | Fracture | 521.00 | 523.00 | 0 |
2011-10-26 | Fracture | 500.50 | 501.00 | 0 |
2011-10-26 | Fracture | 485.50 | 486.00 | 0 |
2011-10-26 | Fracture | 454.00 | 455.00 | 0 |
2011-10-26 | Fracture | 450.00 | 450.50 | 0 |
2011-09-20 | Perforation | 699.50 | 700.00 | 13 |
2011-10-26 | Fracture | 434.50 | 435.00 | 0 |
2011-10-26 | Fracture | 371.00 | 371.50 | 0 |
2011-10-26 | Fracture | 329.00 | 329.50 | 0 |
2011-10-26 | Fracture | 319.50 | 320.00 | 0 |
2011-10-26 | Fracture | 301.00 | 301.50 | 0 |
2011-09-20 | Perforation | 694.50 | 695.50 | 13 |
2011-09-20 | Perforation | 690.00 | 692.00 | 13 |
2011-09-20 | Perforation | 673.00 | 674.00 | 13 |
2011-09-20 | Perforation | 659.80 | 660.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1388 | 0.0 | 0.0 | 0.0 |
2012 | 8747 | 0.0 | 0.0 | 0.0 |
2013 | 8727 | 0.0 | 0.0 | 0.0 |
2014 | 7799 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8776 | 0.0 | 0.0 | 0.0 |
2017 | 8671 | 0.0 | 0.0 | 0.0 |
2018 | 8714 | 0.0 | 0.0 | 0.0 |
2019 | 8425 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[5]