X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294272411003

Well Details

Well ID: 0294272411003
Loading map...
Location: 00/11-24-029-27W4/3
Location Alias: 00/11-24-29-27 W4M
Location Alias 2: 00/11-24-029-27 W4/03
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 27
Section: 24
County/Municipality: Mountain View County
Well Name: NAL SWALWELL 1-24-29-27
Operator Name: NAL Resources Limited
License Number: 0181452
License Date: 1995-10-16
License Status: Amended
Spud Date: 2000-01-03
Final Drill Date: 2000-01-31
Well Total Depth: 3131.00 m
Surface Hole Latitude: 51.492306
Surface Hole Longitude: -113.666758

For data sources see[1][2]

Well History

Date Event
1995-10-16 Obtained License
1999-12-04 Well Log Performed
2000-01-07 Direction Drilling Operation Performed - Horizontal
2000-01-14 Well Log Performed
2000-01-15 Well Log Performed
2000-01-31 Finished Drilling
2000-01-31 Well Log Performed
2000-01-31 Well Mode changed to Drilled and Cased
2000-02-01 Liner Casing Operation Performed
2000-02-01 Perforation Treatment Performed - Open-Hole Completion
2000-02-01 Well Log Performed
2000-02-03 Rig Released
2000-02-24 Well Log Performed
2000-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-06-12 Perforation Treatment Performed - Cement Plug
2007-06-12 Plug Back Performed
2007-06-14 Perforation Treatment Performed - Jet Perforation
2007-07-04 Perforation Treatment Performed - Fractured
2008-02-14 Well Began Production
2008-02-14 Well Fluid changed to Gas
2008-02-14 Well Mode changed to Flowing
2010-05-31 Well Fluid changed to Gas
2010-05-31 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-01-07 2143.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-01 Open Hole/Barefoot Completion 2143.60 3131.00 0
2000-02-28 Acid Treatment 2143.60 3131.00 0
2007-06-12 Cement Plug 2131.00 2191.50 0
2007-06-12 Packing Device Capped w/Cement 2092.00 2130.00 0
2007-06-14 Perforation 1891.00 1893.00 17
2007-07-04 Fracture 1891.00 1893.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 8039 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8255 0.0 0.0 0.0
2011 8568 0.0 0.0 0.0
2012 7986 0.0 0.0 0.0
2013 8753 0.0 0.0 0.0
2014 7573 0.0 0.0 0.0
2015 7919 0.0 0.0 0.0
2016 8064 0.0 0.0 0.0
2017 5456 0.0 0.0 0.0
2018 5568 0.0 0.0 0.0
2019 7371 0.0 0.0 0.0
2020 1867 0.0 0.0 0.0

For data sources see[6]

References