If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294270206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.449264,"lon":-113.703566,"icon":""}]} |
Location: 00/06-02-029-27W4/0 | |
Location Alias: 00/06-02-29-27 W4M | |
Location Alias 2: 00/06-02-029-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 02 | |
County/Municipality: Mountain View County | |
Well Name: EMBER DD ET AL IRCANA 6-2-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0396187 | |
License Date: 2008-04-28 | |
License Status: Amended | |
Spud Date: 2008-09-08 | |
Final Drill Date: 2008-09-09 | |
Well Total Depth: 1113.00 m | |
Surface Hole Latitude: 51.449264 | |
Surface Hole Longitude: -113.703566 |
Date | Event |
---|---|
2008-04-28 | Obtained License |
2008-07-04 | Surface Casing Operation Performed |
2008-09-09 | Finished Drilling |
2008-09-09 | Production Casing Operation Performed |
2008-09-09 | Well Log Performed |
2008-09-09 | Well Mode changed to Drilled and Cased |
2008-09-10 | Rig Released |
2008-09-15 | Well Log Performed |
2008-09-21 | Perforation Treatment Performed - Jet Perforation |
2008-10-04 | Perforation Treatment Performed - Fractured |
2008-10-21 | Well Began Production |
2008-10-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-10-21 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-09-21 | Perforation | 737.70 | 738.70 | 13 |
2008-09-21 | Perforation | 650.30 | 650.80 | 13 |
2008-09-21 | Perforation | 646.50 | 647.50 | 13 |
2008-09-21 | Perforation | 640.30 | 642.80 | 13 |
2008-09-21 | Perforation | 637.40 | 638.40 | 13 |
2008-09-21 | Perforation | 626.20 | 627.20 | 13 |
2008-09-21 | Perforation | 620.50 | 623.00 | 13 |
2008-09-21 | Perforation | 607.50 | 608.50 | 13 |
2008-09-21 | Perforation | 574.90 | 575.90 | 13 |
2008-09-21 | Perforation | 572.30 | 573.30 | 13 |
2008-09-21 | Perforation | 569.30 | 570.30 | 13 |
2008-09-21 | Perforation | 728.50 | 729.50 | 13 |
2008-09-21 | Perforation | 527.80 | 529.80 | 13 |
2008-09-21 | Perforation | 451.80 | 454.80 | 13 |
2008-09-21 | Perforation | 435.30 | 435.80 | 13 |
2008-09-21 | Perforation | 407.30 | 407.80 | 13 |
2008-09-21 | Perforation | 334.60 | 336.10 | 13 |
2008-09-21 | Perforation | 328.00 | 329.00 | 13 |
2008-10-04 | Fracture | 737.70 | 738.70 | 0 |
2008-10-04 | Fracture | 728.50 | 729.50 | 0 |
2008-10-04 | Fracture | 725.10 | 726.10 | 0 |
2008-10-04 | Fracture | 716.70 | 717.70 | 0 |
2008-09-21 | Perforation | 725.10 | 726.10 | 13 |
2008-10-04 | Fracture | 711.40 | 712.40 | 0 |
2008-10-04 | Fracture | 704.90 | 706.40 | 0 |
2008-10-04 | Fracture | 689.20 | 689.70 | 0 |
2008-10-04 | Fracture | 677.50 | 679.50 | 0 |
2008-10-04 | Fracture | 668.40 | 670.40 | 0 |
2008-10-04 | Fracture | 650.30 | 650.80 | 0 |
2008-10-04 | Fracture | 646.50 | 647.50 | 0 |
2008-10-04 | Fracture | 640.30 | 642.80 | 0 |
2008-10-04 | Fracture | 637.40 | 638.40 | 0 |
2008-10-04 | Fracture | 626.20 | 627.20 | 0 |
2008-09-21 | Perforation | 716.70 | 717.70 | 13 |
2008-10-04 | Fracture | 620.50 | 623.00 | 0 |
2008-10-04 | Fracture | 607.50 | 608.50 | 0 |
2008-10-04 | Fracture | 574.90 | 575.90 | 0 |
2008-10-04 | Fracture | 572.30 | 573.30 | 0 |
2008-10-04 | Fracture | 569.30 | 570.30 | 0 |
2008-10-04 | Fracture | 527.80 | 529.80 | 0 |
2008-10-04 | Fracture | 451.80 | 454.80 | 0 |
2008-10-04 | Fracture | 435.30 | 435.80 | 0 |
2008-10-04 | Fracture | 407.30 | 407.80 | 0 |
2008-10-04 | Fracture | 334.60 | 336.10 | 0 |
2008-09-21 | Perforation | 711.40 | 712.40 | 13 |
2008-10-04 | Fracture | 328.00 | 329.00 | 0 |
2008-09-21 | Perforation | 704.90 | 706.40 | 13 |
2008-09-21 | Perforation | 689.20 | 689.70 | 13 |
2008-09-21 | Perforation | 677.50 | 679.50 | 13 |
2008-09-21 | Perforation | 668.40 | 670.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1679 | 0.0 | 0.0 | 0.0 |
2009 | 8344 | 0.0 | 0.0 | 0.0 |
2010 | 6862 | 0.0 | 0.0 | 0.0 |
2011 | 8284 | 0.0 | 0.0 | 0.0 |
2012 | 8686 | 0.0 | 0.0 | 0.0 |
2013 | 8680 | 0.0 | 0.0 | 0.0 |
2014 | 4703 | 0.0 | 0.0 | 0.0 |
2015 | 6521 | 0.0 | 0.0 | 0.0 |
2016 | 8741 | 0.0 | 0.0 | 0.0 |
2017 | 8639 | 0.0 | 0.0 | 0.0 |
2018 | 8531 | 0.0 | 0.0 | 0.0 |
2019 | 8409 | 0.0 | 0.0 | 0.0 |
2020 | 2170 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-08-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]