X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294270103000

Well Details

Well ID: 0294270103000
Loading map...
Location: 00/03-01-029-27W4/0
Location Alias: 00/03-01-29-27 W4M
Location Alias 2: 00/03-01-029-27 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 27
Section: 01
County/Municipality: Mountain View County
Well Name: EMBER ET AL IRCANA 3-1-29-27
Operator Name: Ember Resources Inc.
License Number: 0413848
License Date: 2009-11-12
License Status: Issued
Spud Date: 2009-12-12
Final Drill Date: 2009-12-14
Well Total Depth: 1087.00 m
Surface Hole Latitude: 51.448703
Surface Hole Longitude: -113.674457

For data sources see[1][2]

Well History

Date Event
2009-11-12 Obtained License
2009-12-13 Surface Casing Operation Performed
2009-12-14 Finished Drilling
2009-12-14 Production Casing Operation Performed
2009-12-14 Well Mode changed to Drilled and Cased
2009-12-15 Rig Released
2009-12-19 Well Log Performed
2010-01-04 Perforation Treatment Performed - Jet Perforation
2010-01-04 Well Log Performed
2010-01-09 Perforation Treatment Performed - Fractured
2010-01-31 Well Began Production
2010-01-31 Well Fluid changed to Coalbed Methane-Coals Only
2010-01-31 Well Mode changed to Flowing
2010-04-20 Well Log Performed
2010-04-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-04 Perforation 739.50 740.00 13
2010-01-04 Perforation 670.30 670.80 13
2010-01-04 Perforation 659.50 661.00 13
2010-01-04 Perforation 642.60 643.10 13
2010-01-04 Perforation 633.00 635.50 13
2010-01-04 Perforation 629.00 632.00 13
2010-01-04 Perforation 624.40 624.90 13
2010-01-04 Perforation 573.10 573.60 13
2010-01-04 Perforation 571.00 571.50 13
2010-01-04 Perforation 568.10 568.60 13
2010-01-04 Perforation 565.30 566.80 13
2010-01-04 Perforation 724.50 727.50 13
2010-01-04 Perforation 562.60 563.60 13
2010-01-04 Perforation 557.30 559.80 13
2010-01-04 Perforation 523.50 524.00 13
2010-01-04 Perforation 522.00 523.00 13
2010-01-04 Perforation 519.50 521.00 13
2010-01-04 Perforation 454.20 454.70 13
2010-01-04 Perforation 442.80 446.30 13
2010-01-04 Perforation 438.40 438.90 13
2010-01-04 Perforation 434.40 434.90 13
2010-01-04 Perforation 398.30 400.80 13
2010-01-04 Perforation 716.00 718.00 13
2010-01-04 Perforation 396.50 397.50 13
2010-01-04 Perforation 390.50 392.00 13
2010-01-04 Perforation 383.50 384.50 13
2010-01-04 Perforation 370.30 370.80 13
2010-01-04 Perforation 363.30 364.80 13
2010-01-04 Perforation 343.50 345.50 13
2010-01-04 Perforation 335.40 335.90 13
2010-01-04 Perforation 327.00 328.50 13
2010-01-04 Perforation 319.00 319.50 13
2010-01-04 Perforation 952.50 954.00 17
2010-01-04 Perforation 712.00 713.50 13
2010-01-04 Perforation 886.50 887.00 17
2010-01-04 Perforation 877.50 878.50 17
2010-01-04 Perforation 782.50 783.50 17
2010-01-09 Fracture 952.50 954.00 0
2010-01-09 Fracture 886.50 887.00 0
2010-01-09 Fracture 877.50 878.50 0
2010-01-09 Fracture 782.50 783.50 0
2010-01-09 Fracture 739.50 740.00 0
2010-01-09 Fracture 724.50 727.50 0
2010-01-09 Fracture 716.00 718.00 0
2010-01-04 Perforation 710.00 710.50 13
2010-01-09 Fracture 712.00 713.50 0
2010-01-09 Fracture 710.00 710.50 0
2010-01-09 Fracture 702.70 703.70 0
2010-01-09 Fracture 693.60 694.60 0
2010-01-09 Fracture 680.00 684.00 0
2010-01-09 Fracture 674.90 675.40 0
2010-01-09 Fracture 670.30 670.80 0
2010-01-09 Fracture 659.50 661.00 0
2010-01-09 Fracture 642.60 643.10 0
2010-01-09 Fracture 633.00 635.50 0
2010-01-04 Perforation 702.70 703.70 13
2010-01-09 Fracture 629.00 632.00 0
2010-01-09 Fracture 624.40 624.90 0
2010-01-09 Fracture 573.10 573.60 0
2010-01-09 Fracture 571.00 571.50 0
2010-01-09 Fracture 568.10 568.60 0
2010-01-09 Fracture 565.30 566.80 0
2010-01-09 Fracture 562.60 563.60 0
2010-01-09 Fracture 557.30 559.80 0
2010-01-09 Fracture 523.50 524.00 0
2010-01-09 Fracture 522.00 523.00 0
2010-01-04 Perforation 693.60 694.60 13
2010-01-09 Fracture 519.50 521.00 0
2010-01-09 Fracture 454.20 454.70 0
2010-01-09 Fracture 442.80 446.30 0
2010-01-09 Fracture 438.40 438.90 0
2010-01-09 Fracture 434.40 434.90 0
2010-01-09 Fracture 398.30 400.80 0
2010-01-09 Fracture 396.50 397.50 0
2010-01-09 Fracture 390.50 392.00 0
2010-01-09 Fracture 383.50 384.50 0
2010-01-09 Fracture 370.30 370.80 0
2010-01-04 Perforation 680.00 684.00 13
2010-01-09 Fracture 363.30 364.80 0
2010-01-09 Fracture 343.50 345.50 0
2010-01-09 Fracture 335.40 335.90 0
2010-01-09 Fracture 327.00 328.50 0
2010-01-09 Fracture 319.00 319.50 0
2010-01-04 Perforation 674.90 675.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7711 0.0 0.0 0.0
2011 8433 0.0 0.0 0.0
2012 8672 0.0 0.0 0.0
2013 8278 0.0 0.0 0.0
2014 4693 0.0 0.0 0.0
2015 5226 0.0 0.0 0.0
2016 8708 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 8645 0.0 0.0 0.0
2019 8311 0.0 0.0 0.0
2020 2077 0.0 0.0 0.0

For data sources see[5]

References