X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294270101000

Well Details

Well ID: 0294270101000
Loading map...
Location: 00/01-01-029-27W4/0
Location Alias: 00/01-01-29-27 W4M
Location Alias 2: 00/01-01-029-27 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 27
Section: 01
County/Municipality: Mountain View County
Well Name: EMBER ET AL IRCANA 1-1-29-27
Operator Name: Ember Resources Inc.
License Number: 0413847
License Date: 2009-11-12
License Status: Issued
Spud Date: 2009-12-10
Final Drill Date: 2009-12-12
Well Total Depth: 1095.00 m
Surface Hole Latitude: 51.448704
Surface Hole Longitude: -113.666873

For data sources see[1][2]

Well History

Date Event
2009-11-12 Obtained License
2009-12-10 Surface Casing Operation Performed
2009-12-12 Finished Drilling
2009-12-12 Production Casing Operation Performed
2009-12-12 Rig Released
2009-12-12 Well Mode changed to Drilled and Cased
2009-12-18 Well Log Performed
2010-01-03 Perforation Treatment Performed - Jet Perforation
2010-01-03 Well Log Performed
2010-01-08 Perforation Treatment Performed - Fractured
2010-02-01 Well Began Production
2010-02-01 Well Fluid changed to Coalbed Methane-Coals Only
2010-02-01 Well Mode changed to Flowing
2010-04-20 Well Log Performed
2010-04-22 Well Log Performed
2010-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-03 Perforation 739.40 739.90 13
2010-01-03 Perforation 674.90 676.90 13
2010-01-03 Perforation 669.50 670.00 13
2010-01-03 Perforation 657.20 659.70 13
2010-01-03 Perforation 643.50 644.00 13
2010-01-03 Perforation 624.50 625.00 13
2010-01-03 Perforation 618.20 618.70 13
2010-01-03 Perforation 607.20 607.70 13
2010-01-03 Perforation 599.40 599.90 13
2010-01-03 Perforation 572.80 573.30 13
2010-01-03 Perforation 570.70 571.20 13
2010-01-03 Perforation 728.80 729.30 13
2010-01-03 Perforation 565.20 566.20 13
2010-01-03 Perforation 558.40 558.90 13
2010-01-03 Perforation 554.00 555.00 13
2010-01-03 Perforation 496.30 499.30 13
2010-01-03 Perforation 485.50 489.00 13
2010-01-03 Perforation 478.30 478.80 13
2010-01-03 Perforation 452.50 453.00 13
2010-01-03 Perforation 443.70 447.20 13
2010-01-03 Perforation 431.60 432.60 13
2010-01-03 Perforation 401.80 402.80 13
2010-01-03 Perforation 724.40 725.40 13
2010-01-03 Perforation 395.10 398.10 13
2010-01-03 Perforation 333.90 334.40 13
2010-01-03 Perforation 326.80 328.30 13
2010-01-03 Perforation 318.70 319.20 13
2010-01-03 Perforation 312.50 313.00 13
2010-01-03 Perforation 307.20 307.70 13
2010-01-03 Perforation 303.70 306.20 13
2010-01-03 Perforation 956.00 958.00 17
2010-01-03 Perforation 947.50 949.00 17
2010-01-03 Perforation 917.20 918.20 17
2010-01-03 Perforation 714.70 716.70 13
2010-01-03 Perforation 854.00 858.00 17
2010-01-08 Fracture 956.00 958.00 0
2010-01-08 Fracture 947.50 949.00 0
2010-01-08 Fracture 917.20 918.20 0
2010-01-08 Fracture 854.00 858.00 0
2010-01-08 Fracture 739.40 739.90 0
2010-01-08 Fracture 728.80 729.30 0
2010-01-08 Fracture 724.40 725.40 0
2010-01-08 Fracture 714.70 716.70 0
2010-01-08 Fracture 712.70 713.70 0
2010-01-03 Perforation 712.70 713.70 13
2010-01-08 Fracture 711.20 711.70 0
2010-01-08 Fracture 702.10 703.10 0
2010-01-08 Fracture 693.50 694.50 0
2010-01-08 Fracture 678.00 678.50 0
2010-01-08 Fracture 674.90 676.90 0
2010-01-08 Fracture 669.50 670.00 0
2010-01-08 Fracture 657.20 659.70 0
2010-01-08 Fracture 643.50 644.00 0
2010-01-08 Fracture 624.50 625.00 0
2010-01-08 Fracture 618.20 618.70 0
2010-01-03 Perforation 711.20 711.70 13
2010-01-08 Fracture 607.20 607.70 0
2010-01-08 Fracture 599.40 599.90 0
2010-01-08 Fracture 572.80 573.30 0
2010-01-08 Fracture 570.70 571.20 0
2010-01-08 Fracture 565.20 566.20 0
2010-01-08 Fracture 558.40 558.90 0
2010-01-08 Fracture 554.00 555.00 0
2010-01-08 Fracture 496.30 499.30 0
2010-01-08 Fracture 485.50 489.00 0
2010-01-08 Fracture 478.30 478.80 0
2010-01-03 Perforation 702.10 703.10 13
2010-01-08 Fracture 452.50 453.00 0
2010-01-08 Fracture 443.70 447.20 0
2010-01-08 Fracture 431.60 432.60 0
2010-01-08 Fracture 401.80 402.80 0
2010-01-08 Fracture 395.10 398.10 0
2010-01-08 Fracture 333.90 334.40 0
2010-01-08 Fracture 326.80 328.30 0
2010-01-08 Fracture 318.70 319.20 0
2010-01-08 Fracture 312.50 313.00 0
2010-01-08 Fracture 307.20 307.70 0
2010-01-03 Perforation 693.50 694.50 13
2010-01-08 Fracture 303.70 306.20 0
2010-05-19 Packing Device Capped w/Cement 836.80 844.80 0
2010-01-03 Perforation 678.00 678.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7858 0.0 0.0 0.0
2011 8396 0.0 0.0 0.0
2012 8683 0.0 0.0 0.0
2013 8714 0.0 0.0 0.0
2014 4702 0.0 0.0 0.0
2015 5231 0.0 0.0 0.0
2016 8695 0.0 0.0 0.0
2017 8738 0.0 0.0 0.0
2018 8649 0.0 0.0 0.0
2019 7194 0.0 0.0 0.0
2020 2141 0.0 0.0 0.0

For data sources see[5]

References