If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294262712000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.511185,"lon":-113.586651,"icon":""}]} |
Location: 00/12-27-029-26W4/0 | |
Location Alias: 00/12-27-29-26 W4M | |
Location Alias 2: 00/12-27-029-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 27 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 12-27-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0408848 | |
License Date: 2009-01-30 | |
License Status: Issued | |
Spud Date: 2009-02-06 | |
Final Drill Date: 2009-02-07 | |
Well Total Depth: 976.00 m | |
Surface Hole Latitude: 51.511185 | |
Surface Hole Longitude: -113.586651 |
Date | Event |
---|---|
2009-01-30 | Obtained License |
2009-02-06 | Surface Casing Operation Performed |
2009-02-07 | Finished Drilling |
2009-02-07 | Production Casing Operation Performed |
2009-02-07 | Rig Released |
2009-02-07 | Well Mode changed to Drilled and Cased |
2009-02-10 | Well Log Performed |
2009-03-01 | Perforation Treatment Performed - Jet Perforation |
2009-03-04 | Perforation Treatment Performed - Fractured |
2009-03-30 | Well Began Production |
2009-03-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-30 | Well Mode changed to Flowing |
2010-07-04 | Perforation Treatment Performed - Jet Perforation |
2010-07-30 | Perforation Treatment Performed - Fractured |
2010-08-03 | Well Structure changed to Commingled |
2010-08-16 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-03-01 | Perforation | 489.70 | 490.20 | 14 |
2009-03-01 | Perforation | 630.30 | 630.80 | 14 |
2009-03-01 | Perforation | 643.80 | 644.30 | 14 |
2009-03-01 | Perforation | 634.00 | 635.00 | 14 |
2009-03-01 | Perforation | 610.70 | 611.70 | 14 |
2009-03-01 | Perforation | 597.60 | 598.10 | 14 |
2009-03-01 | Perforation | 622.30 | 622.80 | 14 |
2009-03-01 | Perforation | 617.60 | 618.60 | 14 |
2009-03-04 | Fracture | 408.00 | 410.00 | 0 |
2009-03-04 | Fracture | 244.00 | 644.30 | 0 |
2010-07-04 | Perforation | 949.00 | 951.00 | 13 |
2009-03-01 | Perforation | 479.80 | 480.30 | 14 |
2010-07-04 | Perforation | 767.00 | 770.00 | 13 |
2010-07-04 | Perforation | 468.50 | 470.50 | 13 |
2010-07-04 | Perforation | 448.00 | 450.00 | 13 |
2010-07-04 | Perforation | 419.00 | 421.00 | 13 |
2010-07-04 | Perforation | 395.00 | 397.00 | 13 |
2010-07-04 | Perforation | 389.00 | 390.00 | 13 |
2010-07-04 | Perforation | 384.00 | 385.00 | 13 |
2010-07-04 | Perforation | 264.00 | 265.00 | 13 |
2010-07-04 | Perforation | 256.00 | 257.00 | 13 |
2010-07-30 | Fracture | 949.00 | 951.00 | 0 |
2009-03-01 | Perforation | 556.40 | 559.40 | 14 |
2010-08-16 | Fracture | 256.00 | 470.50 | 0 |
2009-03-01 | Perforation | 493.20 | 493.70 | 14 |
2009-03-01 | Perforation | 244.00 | 244.50 | 14 |
2009-03-01 | Perforation | 408.00 | 410.00 | 14 |
2009-03-01 | Perforation | 358.80 | 359.80 | 14 |
2009-03-01 | Perforation | 250.30 | 250.80 | 14 |
2009-03-01 | Perforation | 631.70 | 632.70 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6648 | 0.0 | 0.0 | 0.0 |
2010 | 5815 | 0.0 | 0.0 | 0.0 |
For data sources see[5]