If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294261516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.487908,"lon":-113.572161,"icon":""}]} |
Location: 00/16-15-029-26W4/0 | |
Location Alias: 00/16-15-29-26 W4M | |
Location Alias 2: 00/16-15-029-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 15 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 16-15-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425676 | |
License Date: 2010-11-09 | |
License Status: Issued | |
Spud Date: 2010-12-14 | |
Final Drill Date: 2011-01-07 | |
Well Total Depth: 975.00 m | |
Surface Hole Latitude: 51.487908 | |
Surface Hole Longitude: -113.572161 |
Date | Event |
---|---|
2010-11-09 | Obtained License |
2010-12-14 | Surface Casing Operation Performed |
2011-01-07 | Finished Drilling |
2011-01-07 | Well Mode changed to Drilled and Cased |
2011-01-08 | Production Casing Operation Performed |
2011-01-08 | Rig Released |
2011-01-14 | Well Log Performed |
2011-02-14 | Perforation Treatment Performed - Jet Perforation |
2011-03-03 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Perforation Treatment Performed - Fractured |
2011-07-25 | Well Began Production |
2011-07-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-07-25 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-14 | Perforation | 396.00 | 398.00 | 13 |
2011-03-03 | Perforation | 370.70 | 371.20 | 13 |
2011-03-03 | Perforation | 351.20 | 351.70 | 13 |
2011-03-03 | Perforation | 478.80 | 479.30 | 13 |
2011-03-03 | Perforation | 424.60 | 425.10 | 13 |
2011-03-03 | Perforation | 560.20 | 560.70 | 13 |
2011-03-03 | Perforation | 629.20 | 629.70 | 13 |
2011-03-03 | Perforation | 626.80 | 627.30 | 13 |
2011-03-03 | Perforation | 657.10 | 657.60 | 13 |
2011-03-03 | Perforation | 644.20 | 644.70 | 13 |
2011-03-03 | Perforation | 623.00 | 624.00 | 13 |
2011-02-14 | Perforation | 565.00 | 567.00 | 13 |
2011-03-03 | Perforation | 583.20 | 583.70 | 13 |
2011-03-03 | Perforation | 580.00 | 582.00 | 13 |
2011-03-03 | Perforation | 617.70 | 618.70 | 13 |
2011-03-03 | Perforation | 611.10 | 612.10 | 13 |
2011-03-03 | Perforation | 252.80 | 253.30 | 13 |
2011-03-03 | Perforation | 348.00 | 350.00 | 13 |
2011-03-03 | Perforation | 331.00 | 334.00 | 13 |
2011-03-03 | Perforation | 363.00 | 366.00 | 13 |
2011-03-03 | Perforation | 357.00 | 360.00 | 13 |
2011-03-03 | Perforation | 297.00 | 299.00 | 13 |
2011-02-14 | Perforation | 254.00 | 256.00 | 13 |
2011-03-03 | Perforation | 212.00 | 214.00 | 13 |
2011-03-03 | Perforation | 185.50 | 188.50 | 13 |
2011-03-03 | Perforation | 269.00 | 272.00 | 13 |
2011-03-03 | Perforation | 235.00 | 238.00 | 13 |
2011-03-03 | Perforation | 379.00 | 381.00 | 13 |
2011-03-03 | Perforation | 228.50 | 229.00 | 13 |
2011-03-03 | Perforation | 634.00 | 637.00 | 13 |
2011-03-03 | Perforation | 245.60 | 246.60 | 13 |
2011-03-03 | Perforation | 244.10 | 244.60 | 13 |
2011-03-03 | Perforation | 400.00 | 403.00 | 13 |
2011-02-14 | Perforation | 319.00 | 321.00 | 13 |
2011-03-03 | Perforation | 390.00 | 391.00 | 13 |
2011-03-03 | Perforation | 410.00 | 412.00 | 13 |
2011-03-03 | Perforation | 596.00 | 599.00 | 13 |
2011-03-15 | Fracture | 228.50 | 657.60 | 0 |
2011-03-15 | Fracture | 212.00 | 214.00 | 0 |
2011-03-03 | Perforation | 529.30 | 529.80 | 13 |
2011-03-03 | Perforation | 508.00 | 508.50 | 13 |
2011-03-03 | Perforation | 553.80 | 554.30 | 13 |
2011-03-03 | Perforation | 533.30 | 534.30 | 13 |
2011-03-03 | Perforation | 496.10 | 498.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3838 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8736 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8683 | 0.0 | 0.0 | 0.0 |
2018 | 8725 | 0.0 | 0.0 | 0.0 |
2019 | 8698 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]