If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294261509003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.484324,"lon":-113.571121,"icon":""}]} |
Location: 00/09-15-029-26W4/3 | |
Location Alias: 00/09-15-29-26 W4M | |
Location Alias 2: 00/09-15-029-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 15 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 9-15-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0397385 | |
License Date: 2008-06-10 | |
License Status: Issued | |
Spud Date: 2008-11-07 | |
Final Drill Date: 2008-11-08 | |
Well Total Depth: 980.00 m | |
Surface Hole Latitude: 51.484324 | |
Surface Hole Longitude: -113.571121 |
Date | Event |
---|---|
2008-06-10 | Obtained License |
2008-11-07 | Surface Casing Operation Performed |
2008-11-08 | Finished Drilling |
2008-11-08 | Well Mode changed to Drilled and Cased |
2008-11-09 | Production Casing Operation Performed |
2008-11-09 | Rig Released |
2008-11-13 | Well Log Performed |
2008-11-24 | Perforation Treatment Performed - Jet Perforation |
2008-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-12-10 | Perforation Treatment Performed - Jet Perforation |
2008-12-10 | Plug Back Performed |
2009-02-02 | Perforation Treatment Performed - Fractured |
2009-02-17 | Perforation Treatment Performed - Jet Perforation |
2009-02-21 | Perforation Treatment Performed - Fractured |
2009-02-27 | Well Began Production |
2009-02-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-11-24 | Perforation | 709.50 | 712.50 | 13 |
2009-02-17 | Perforation | 498.20 | 498.70 | 13 |
2009-02-17 | Perforation | 363.30 | 363.80 | 13 |
2009-02-17 | Perforation | 544.50 | 546.50 | 13 |
2009-02-17 | Perforation | 441.50 | 443.50 | 13 |
2009-02-17 | Perforation | 321.00 | 322.00 | 13 |
2009-02-17 | Perforation | 352.10 | 352.60 | 13 |
2009-02-17 | Perforation | 253.10 | 253.60 | 13 |
2009-02-17 | Perforation | 244.70 | 245.20 | 13 |
2009-02-17 | Perforation | 534.10 | 535.10 | 13 |
2009-02-17 | Perforation | 632.20 | 632.70 | 13 |
2008-12-10 | Perforation | 465.00 | 469.00 | 13 |
2009-02-17 | Perforation | 627.80 | 628.30 | 13 |
2009-02-17 | Perforation | 621.20 | 622.20 | 13 |
2009-02-17 | Perforation | 645.40 | 645.90 | 13 |
2009-02-17 | Perforation | 636.80 | 637.80 | 13 |
2009-02-17 | Perforation | 634.70 | 635.20 | 13 |
2009-02-17 | Perforation | 614.70 | 615.70 | 13 |
2009-02-17 | Perforation | 554.40 | 554.90 | 13 |
2009-02-17 | Perforation | 583.00 | 585.00 | 13 |
2009-02-17 | Perforation | 562.80 | 563.30 | 13 |
2009-02-17 | Perforation | 600.80 | 601.30 | 13 |
2008-12-10 | Packing Device Capped w/Cement | 698.00 | 706.00 | 0 |
2009-02-17 | Perforation | 594.10 | 594.60 | 13 |
2009-02-17 | Perforation | 586.20 | 586.70 | 13 |
2009-02-21 | Fracture | 321.00 | 546.50 | 0 |
2009-02-21 | Fracture | 244.70 | 645.90 | 0 |
2009-02-02 | Fracture | 465.00 | 467.00 | 0 |
2009-02-17 | Perforation | 497.20 | 497.70 | 13 |
2009-02-17 | Perforation | 422.30 | 422.80 | 13 |
2009-02-17 | Perforation | 377.80 | 378.30 | 13 |
2009-02-17 | Perforation | 528.50 | 529.00 | 13 |
2009-02-17 | Perforation | 509.90 | 510.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 7391 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 8085 | 0.0 | 0.0 | 0.0 |
2012 | 8639 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8739 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8683 | 0.0 | 0.0 | 0.0 |
2018 | 8725 | 0.0 | 0.0 | 0.0 |
2019 | 8698 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]