If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294261505002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.479295,"lon":-113.586179,"icon":""}]} |
Location: 00/05-15-029-26W4/2 | |
Location Alias: 00/05-15-29-26 W4M | |
Location Alias 2: 00/05-15-029-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 15 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 5-15-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0397713 | |
License Date: 2008-06-19 | |
License Status: Issued | |
Spud Date: 2008-11-10 | |
Final Drill Date: 2008-11-13 | |
Well Total Depth: 978.00 m | |
Surface Hole Latitude: 51.479295 | |
Surface Hole Longitude: -113.586179 |
Date | Event |
---|---|
2008-06-19 | Obtained License |
2008-11-10 | Surface Casing Operation Performed |
2008-11-13 | Finished Drilling |
2008-11-13 | Well Mode changed to Drilled and Cased |
2008-11-14 | Production Casing Operation Performed |
2008-11-14 | Rig Released |
2008-11-17 | Well Log Performed |
2008-11-27 | Perforation Treatment Performed - Jet Perforation |
2008-12-16 | Perforation Treatment Performed - Fractured |
2009-01-20 | Perforation Treatment Performed - Jet Perforation |
2009-02-02 | Perforation Treatment Performed - Fractured |
2009-02-07 | Well Fluid changed to Gas |
2009-02-07 | Well Mode changed to Testing |
2011-01-16 | Perforation Treatment Performed - Jet Perforation |
2011-02-05 | Perforation Treatment Performed - Fractured |
2011-08-25 | Perforation Treatment Performed - Jet Perforation |
2011-09-06 | Perforation Treatment Performed - Fractured |
2017-04-05 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-11-27 | Perforation | 957.00 | 960.00 | 13 |
2011-08-25 | Perforation | 210.00 | 212.00 | 13 |
2011-08-25 | Perforation | 230.00 | 233.00 | 13 |
2011-08-25 | Perforation | 235.00 | 238.00 | 13 |
2011-08-25 | Perforation | 401.00 | 403.00 | 13 |
2011-08-25 | Perforation | 425.80 | 426.80 | 13 |
2011-08-25 | Perforation | 445.00 | 447.00 | 13 |
2011-08-25 | Perforation | 466.00 | 469.00 | 13 |
2011-08-25 | Perforation | 474.50 | 477.50 | 13 |
2011-08-25 | Perforation | 478.70 | 479.20 | 13 |
2011-08-25 | Perforation | 494.60 | 495.60 | 13 |
2008-12-16 | Fracture | 957.00 | 960.00 | 0 |
2011-08-25 | Perforation | 497.40 | 498.40 | 13 |
2011-08-25 | Perforation | 500.50 | 503.50 | 13 |
2011-08-25 | Perforation | 529.90 | 530.40 | 13 |
2011-08-25 | Perforation | 535.00 | 536.00 | 13 |
2011-08-25 | Perforation | 548.50 | 550.50 | 13 |
2011-08-25 | Perforation | 557.10 | 557.60 | 13 |
2011-08-25 | Perforation | 561.80 | 562.80 | 13 |
2011-08-25 | Perforation | 581.60 | 583.60 | 13 |
2011-08-25 | Perforation | 593.80 | 594.30 | 13 |
2011-08-25 | Perforation | 600.20 | 601.20 | 13 |
2009-01-20 | Perforation | 372.00 | 375.00 | 13 |
2011-08-25 | Perforation | 609.50 | 612.00 | 13 |
2011-08-25 | Perforation | 614.10 | 614.60 | 13 |
2011-08-25 | Perforation | 614.80 | 615.80 | 13 |
2011-08-25 | Perforation | 620.00 | 621.50 | 13 |
2011-08-25 | Perforation | 626.90 | 627.90 | 13 |
2011-08-25 | Perforation | 631.00 | 631.50 | 13 |
2011-08-25 | Perforation | 633.90 | 634.40 | 13 |
2011-08-25 | Perforation | 639.00 | 640.50 | 13 |
2011-08-25 | Perforation | 647.80 | 648.80 | 13 |
2011-09-06 | Fracture | 210.00 | 648.80 | 0 |
2009-02-02 | Fracture | 372.00 | 375.00 | 0 |
2011-01-16 | Perforation | 937.00 | 939.00 | 13 |
2011-01-16 | Perforation | 866.50 | 868.50 | 13 |
2011-01-16 | Perforation | 518.50 | 520.50 | 13 |
2011-02-05 | Fracture | 937.00 | 939.00 | 0 |
2011-02-05 | Fracture | 518.50 | 520.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]