X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294260616000

Well Details

Well ID: 0294260616000
Loading map...
Location: 00/16-06-029-26W4/0
Location Alias: 00/16-06-29-26 W4M
Location Alias 2: 00/16-06-029-26 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 26
Section: 06
County/Municipality: Kneehill County
Well Name: EMBER IRCANA 16-6-29-26
Operator Name: Ember Resources Inc.
License Number: 0381494
License Date: 2007-09-06
License Status: Issued
Spud Date: 2007-10-15
Final Drill Date: 2007-10-16
Well Total Depth: 1074.00 m
Surface Hole Latitude: 51.459263
Surface Hole Longitude: -113.639516

For data sources see[1][2]

Well History

Date Event
2007-09-06 Obtained License
2007-10-15 Surface Casing Operation Performed
2007-10-16 Finished Drilling
2007-10-16 Well Log Performed
2007-10-16 Well Mode changed to Drilled and Cased
2007-10-17 Production Casing Operation Performed
2007-10-17 Rig Released
2007-10-20 Well Log Performed
2007-10-26 Well Log Performed
2007-11-13 Perforation Treatment Performed - Jet Perforation
2007-11-15 Perforation Treatment Performed - Fractured
2007-11-22 Well Began Production
2007-11-22 Well Fluid changed to Coalbed Methane-Coals and Other
2007-11-22 Well Mode changed to Flowing
2008-01-02 Well Log Performed
2010-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-08 Perforation Treatment Performed - Jet Perforation
2012-03-02 Perforation Treatment Performed - Cement Squeeze
2012-03-22 Perforation Treatment Performed - Jet Perforation
2012-03-23 Perforation Treatment Performed - Cement Squeeze
2012-03-23 Perforation Treatment Performed - Jet Perforation
2012-03-23 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-11-13 Perforation 1019.50 1022.50 13
2007-11-13 Perforation 653.30 654.30 13
2007-11-13 Perforation 640.70 643.70 13
2007-11-13 Perforation 621.10 623.60 13
2007-11-13 Perforation 595.00 596.00 13
2007-11-13 Perforation 586.40 587.40 13
2007-11-13 Perforation 556.90 557.90 13
2007-11-13 Perforation 553.00 554.50 13
2007-11-13 Perforation 536.20 537.70 13
2007-11-13 Perforation 483.20 484.20 13
2007-11-13 Perforation 477.70 478.70 13
2007-11-13 Perforation 937.00 938.50 13
2007-11-13 Perforation 431.60 432.60 13
2007-11-13 Perforation 417.80 418.80 13
2007-11-13 Perforation 372.60 374.60 13
2007-11-13 Perforation 366.50 368.50 13
2007-11-13 Perforation 327.80 329.80 13
2007-11-13 Perforation 306.40 306.90 13
2007-11-13 Perforation 304.70 305.70 13
2007-11-13 Perforation 297.50 298.50 13
2007-11-13 Perforation 292.10 293.10 13
2007-11-13 Perforation 270.50 271.50 13
2007-11-13 Perforation 899.50 901.50 13
2007-11-15 Fracture 1019.50 1022.50 0
2007-11-15 Fracture 937.00 938.50 0
2007-11-15 Fracture 899.50 901.50 0
2007-11-15 Fracture 718.30 719.30 0
2007-11-15 Fracture 709.10 710.10 0
2007-11-15 Fracture 705.00 707.50 0
2007-11-15 Fracture 684.00 691.00 0
2007-11-15 Fracture 674.50 676.50 0
2007-11-15 Fracture 659.00 660.00 0
2007-11-15 Fracture 653.30 654.30 0
2007-11-13 Perforation 718.30 719.30 13
2007-11-15 Fracture 640.70 643.70 0
2007-11-15 Fracture 621.10 623.60 0
2007-11-15 Fracture 595.00 596.00 0
2007-11-15 Fracture 586.40 587.40 0
2007-11-15 Fracture 556.90 557.90 0
2007-11-15 Fracture 553.00 554.50 0
2007-11-15 Fracture 536.20 537.70 0
2007-11-15 Fracture 483.20 484.20 0
2007-11-15 Fracture 477.70 478.70 0
2007-11-15 Fracture 431.60 432.60 0
2007-11-13 Perforation 709.10 710.10 13
2007-11-15 Fracture 417.80 418.80 0
2007-11-15 Fracture 372.60 374.60 0
2007-11-15 Fracture 366.50 368.50 0
2007-11-15 Fracture 327.80 329.80 0
2007-11-15 Fracture 306.40 306.90 0
2007-11-15 Fracture 304.70 305.70 0
2007-11-15 Fracture 297.50 298.50 0
2007-11-15 Fracture 292.10 293.10 0
2007-11-15 Fracture 270.50 271.50 0
2010-07-10 Packing Device Capped w/Cement 886.00 894.00 0
2007-11-13 Perforation 705.00 707.50 13
2012-02-08 Perforation 145.00 146.00 13
2012-03-02 Cement Squeeze 145.00 146.00 0
2012-03-22 Perforation 118.00 119.00 13
2012-03-22 Perforation 114.00 115.00 13
2012-03-23 Cement Squeeze 118.00 119.00 0
2012-03-23 Cement Squeeze 114.00 115.00 0
2012-03-23 Perforation 114.00 115.00 13
2012-03-23 Remedial Casing Cementing 114.00 115.00 0
2012-03-23 Perforation 118.00 119.00 13
2012-03-23 Remedial Casing Cementing 118.00 119.00 0
2007-11-13 Perforation 684.00 691.00 13
2007-11-13 Perforation 674.50 676.50 13
2007-11-13 Perforation 659.00 660.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 960 0.0 0.0 0.0
2008 8629 0.0 0.0 0.0
2009 8686 0.0 0.0 0.0
2010 8169 0.0 0.0 0.0
2011 8635 0.0 0.0 0.0
2012 7589 0.0 0.0 0.0
2013 8743 0.0 0.0 0.0
2014 4703 0.0 0.0 0.0
2015 5148 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8697 0.0 0.0 0.0
2018 8723 0.0 0.0 0.0
2019 8733 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References