If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294260605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.451359,"lon":-113.656955,"icon":""}]} |
Location: 00/05-06-029-26W4/0 | |
Location Alias: 00/05-06-29-26 W4M | |
Location Alias 2: 00/05-06-029-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER IRCANA 5-6-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0396440 | |
License Date: 2008-05-08 | |
License Status: Issued | |
Spud Date: 2008-09-10 | |
Final Drill Date: 2008-09-11 | |
Well Total Depth: 1076.00 m | |
Surface Hole Latitude: 51.451359 | |
Surface Hole Longitude: -113.656955 |
Date | Event |
---|---|
2008-05-08 | Obtained License |
2008-06-18 | Surface Casing Operation Performed |
2008-09-11 | Finished Drilling |
2008-09-11 | Well Log Performed |
2008-09-11 | Well Mode changed to Drilled and Cased |
2008-09-12 | Production Casing Operation Performed |
2008-09-12 | Rig Released |
2008-09-16 | Well Log Performed |
2008-10-01 | Perforation Treatment Performed - Jet Perforation |
2008-10-03 | Perforation Treatment Performed - Fractured |
2008-10-23 | Well Began Production |
2008-10-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-10-23 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-10-01 | Perforation | 990.10 | 992.10 | 13 |
2008-10-01 | Perforation | 695.30 | 696.30 | 13 |
2008-10-01 | Perforation | 687.30 | 688.30 | 13 |
2008-10-01 | Perforation | 670.40 | 671.40 | 13 |
2008-10-01 | Perforation | 664.90 | 665.40 | 13 |
2008-10-01 | Perforation | 655.90 | 656.40 | 13 |
2008-10-01 | Perforation | 653.60 | 655.10 | 13 |
2008-10-01 | Perforation | 639.40 | 639.90 | 13 |
2008-10-01 | Perforation | 627.20 | 629.20 | 13 |
2008-10-01 | Perforation | 625.50 | 626.00 | 13 |
2008-10-01 | Perforation | 619.20 | 619.70 | 13 |
2008-10-01 | Perforation | 986.90 | 987.90 | 13 |
2008-10-01 | Perforation | 609.40 | 610.40 | 13 |
2008-10-01 | Perforation | 591.60 | 592.10 | 13 |
2008-10-01 | Perforation | 559.20 | 559.70 | 13 |
2008-10-01 | Perforation | 557.40 | 557.90 | 13 |
2008-10-01 | Perforation | 546.00 | 546.50 | 13 |
2008-10-01 | Perforation | 460.80 | 461.80 | 13 |
2008-10-01 | Perforation | 447.70 | 448.20 | 13 |
2008-10-01 | Perforation | 427.20 | 427.70 | 13 |
2008-10-01 | Perforation | 363.90 | 364.40 | 13 |
2008-10-01 | Perforation | 320.60 | 321.60 | 13 |
2008-10-01 | Perforation | 909.20 | 910.70 | 13 |
2008-10-01 | Perforation | 311.70 | 312.70 | 13 |
2008-10-01 | Perforation | 305.70 | 306.20 | 13 |
2008-10-03 | Fracture | 715.30 | 716.30 | 0 |
2008-10-03 | Fracture | 706.80 | 708.80 | 0 |
2008-10-03 | Fracture | 704.40 | 706.40 | 0 |
2008-10-03 | Fracture | 695.30 | 696.30 | 0 |
2008-10-03 | Fracture | 687.30 | 688.30 | 0 |
2008-10-03 | Fracture | 670.40 | 671.40 | 0 |
2008-10-03 | Fracture | 664.90 | 665.40 | 0 |
2008-10-03 | Fracture | 655.90 | 656.40 | 0 |
2008-10-01 | Perforation | 839.50 | 841.00 | 13 |
2008-10-03 | Fracture | 653.60 | 655.10 | 0 |
2008-10-03 | Fracture | 639.40 | 639.90 | 0 |
2008-10-03 | Fracture | 627.20 | 629.20 | 0 |
2008-10-03 | Fracture | 625.50 | 626.00 | 0 |
2008-10-03 | Fracture | 619.20 | 619.70 | 0 |
2008-10-03 | Fracture | 609.40 | 610.40 | 0 |
2008-10-03 | Fracture | 591.60 | 592.10 | 0 |
2008-10-03 | Fracture | 559.20 | 559.70 | 0 |
2008-10-03 | Fracture | 557.40 | 557.90 | 0 |
2008-10-03 | Fracture | 546.00 | 546.50 | 0 |
2008-10-01 | Perforation | 765.80 | 766.80 | 13 |
2008-10-03 | Fracture | 460.80 | 461.80 | 0 |
2008-10-03 | Fracture | 447.70 | 448.20 | 0 |
2008-10-03 | Fracture | 427.20 | 427.70 | 0 |
2008-10-03 | Fracture | 363.90 | 364.40 | 0 |
2008-10-03 | Fracture | 320.60 | 321.60 | 0 |
2008-10-03 | Fracture | 311.70 | 312.70 | 0 |
2008-10-03 | Fracture | 305.70 | 306.20 | 0 |
2008-10-01 | Perforation | 762.60 | 765.10 | 13 |
2008-10-01 | Perforation | 715.30 | 716.30 | 13 |
2008-10-01 | Perforation | 706.80 | 708.80 | 13 |
2008-10-01 | Perforation | 704.40 | 706.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1646 | 0.0 | 0.0 | 0.0 |
2009 | 8577 | 0.0 | 0.0 | 0.0 |
2010 | 8662 | 0.0 | 0.0 | 0.0 |
2011 | 8619 | 0.0 | 0.0 | 0.0 |
2012 | 8722 | 0.0 | 0.0 | 0.0 |
2013 | 8757 | 0.0 | 0.0 | 0.0 |
2014 | 4703 | 0.0 | 0.0 | 0.0 |
2015 | 5269 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8656 | 0.0 | 0.0 | 0.0 |
2019 | 8751 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[5]