If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294253608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.527882,"lon":-113.39028,"icon":""}]} |
Location: 00/08-36-029-25W4/0 | |
Location Alias: 00/08-36-29-25 W4M | |
Location Alias 2: 00/08-36-029-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 25 | |
Section: 36 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 8-36-29-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412280 | |
License Date: 2009-09-14 | |
License Status: Issued | |
Spud Date: 2009-11-22 | |
Final Drill Date: 2009-11-23 | |
Well Total Depth: 1147.50 m | |
Surface Hole Latitude: 51.527882 | |
Surface Hole Longitude: -113.390280 |
Date | Event |
---|---|
2009-09-14 | Obtained License |
2009-11-22 | Surface Casing Operation Performed |
2009-11-23 | Direction Drilling Operation Performed - Deviate |
2009-11-23 | Finished Drilling |
2009-11-23 | Well Mode changed to Drilled and Cased |
2009-11-24 | Production Casing Operation Performed |
2009-11-24 | Rig Released |
2009-11-28 | Well Log Performed |
2010-01-15 | Perforation Treatment Performed - Jet Perforation |
2010-01-21 | Perforation Treatment Performed - Jet Perforation |
2010-01-23 | Perforation Treatment Performed - Fractured |
2010-01-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-24 | Well Mode changed to Testing |
2010-02-02 | Well Began Production |
2010-02-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-02 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-23 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-15 | Perforation | 851.20 | 852.50 | 13 |
2010-01-21 | Perforation | 338.90 | 339.40 | 13 |
2010-01-21 | Perforation | 479.80 | 480.30 | 13 |
2010-01-21 | Perforation | 420.00 | 422.00 | 13 |
2010-01-21 | Perforation | 370.40 | 370.90 | 13 |
2010-01-21 | Perforation | 360.90 | 361.90 | 13 |
2010-01-21 | Perforation | 569.20 | 569.70 | 13 |
2010-01-21 | Perforation | 691.10 | 692.10 | 13 |
2010-01-21 | Perforation | 683.40 | 685.90 | 13 |
2010-01-21 | Perforation | 674.50 | 675.50 | 13 |
2010-01-21 | Perforation | 731.20 | 731.70 | 13 |
2010-01-21 | Perforation | 517.60 | 518.60 | 13 |
2010-01-21 | Perforation | 721.90 | 722.40 | 13 |
2010-01-21 | Perforation | 696.60 | 697.60 | 13 |
2010-01-21 | Perforation | 588.10 | 589.10 | 13 |
2010-01-21 | Perforation | 579.00 | 579.50 | 13 |
2010-01-21 | Perforation | 577.00 | 578.00 | 13 |
2010-01-21 | Perforation | 619.90 | 620.90 | 13 |
2010-01-21 | Perforation | 659.80 | 661.80 | 13 |
2010-01-21 | Perforation | 614.00 | 614.50 | 13 |
2010-01-23 | Fracture | 479.80 | 480.30 | 0 |
2010-01-23 | Fracture | 721.90 | 731.70 | 0 |
2010-01-21 | Perforation | 513.70 | 514.20 | 13 |
2010-01-23 | Fracture | 338.80 | 697.60 | 0 |
2010-01-21 | Perforation | 509.30 | 510.30 | 13 |
2010-01-21 | Perforation | 557.70 | 559.20 | 13 |
2010-01-21 | Perforation | 551.60 | 552.60 | 13 |
2010-01-21 | Perforation | 525.00 | 526.50 | 13 |
2010-01-21 | Perforation | 482.00 | 484.00 | 13 |
2010-01-21 | Perforation | 344.50 | 345.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7921 | 0.0 | 0.0 | 0.0 |
2011 | 8726 | 0.0 | 0.0 | 0.0 |
2012 | 4862 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8744 | 0.0 | 0.0 | 0.0 |
2016 | 8757 | 0.0 | 0.0 | 0.0 |
2017 | 8721 | 0.0 | 0.0 | 0.0 |
2018 | 8710 | 0.0 | 0.0 | 0.0 |
2019 | 8704 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[6]