X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294252608000

Well Details

Well ID: 0294252608000
Loading map...
Location: 00/08-26-029-25W4/0
Location Alias: 00/08-26-29-25 W4M
Location Alias 2: 00/08-26-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 26
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 8-26-29-25
Operator Name: Ember Resources Inc.
License Number: 0411788
License Date: 2009-08-12
License Status: Issued
Spud Date: 2009-11-13
Final Drill Date: 2009-11-26
Well Total Depth: 872.00 m
Surface Hole Latitude: 51.510164
Surface Hole Longitude: -113.405325

For data sources see[1][2]

Well History

Date Event
2009-08-12 Obtained License
2009-11-13 Surface Casing Operation Performed
2009-11-26 Finished Drilling
2009-11-26 Production Casing Operation Performed
2009-11-26 Rig Released
2009-11-26 Well Mode changed to Drilled and Cased
2009-12-10 Well Log Performed
2010-01-19 Perforation Treatment Performed - Jet Perforation
2010-01-23 Perforation Treatment Performed - Fractured
2010-01-28 Well Fluid changed to Gas
2010-01-28 Well Mode changed to Testing
2010-02-09 Perforation Treatment Performed - Jet Perforation
2010-02-09 Well Fluid changed to Gas
2010-02-09 Well Mode changed to Test Completed
2010-02-10 Perforation Treatment Performed - Fractured
2017-03-31 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-19 Perforation 624.00 624.50 13
2010-02-09 Perforation 548.40 548.90 13
2010-02-09 Perforation 264.60 265.10 13
2010-02-09 Perforation 331.90 332.40 13
2010-02-09 Perforation 285.40 285.90 13
2010-02-09 Perforation 525.40 525.90 13
2010-02-09 Perforation 517.60 518.60 13
2010-02-09 Perforation 528.10 529.10 13
2010-02-09 Perforation 537.90 538.40 13
2010-02-09 Perforation 534.30 534.80 13
2010-02-09 Perforation 506.90 508.90 13
2010-01-23 Fracture 624.00 624.50 0
2010-02-09 Perforation 482.00 482.50 13
2010-02-09 Perforation 455.90 458.40 13
2010-02-09 Perforation 485.80 486.30 13
2010-02-09 Perforation 501.60 502.10 13
2010-02-09 Perforation 494.20 494.70 13
2010-02-10 Fracture 548.40 554.00 0
2010-02-10 Fracture 264.60 538.40 0
2010-02-09 Perforation 400.40 401.40 13
2010-02-09 Perforation 399.60 400.10 13
2010-02-09 Perforation 409.60 410.10 13
2010-02-09 Perforation 437.60 438.60 13
2010-02-09 Perforation 411.80 412.30 13
2010-02-09 Perforation 377.30 378.80 13
2010-02-09 Perforation 553.50 554.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 28 0.0 0.0 0.0

For data sources see[5]

References