X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294250516000

Well Details

Well ID: 0294250516000
Loading map...
Location: 00/16-05-029-25W4/0
Location Alias: 00/16-05-29-25 W4M
Location Alias 2: 00/16-05-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 05
County/Municipality: Kneehill County
Well Name: PNR ENER SWALWELL 16-5-29-25
Operator Name: TAQA North Ltd.
License Number: 0346453
License Date: 2005-12-21
License Status: Issued
Spud Date: 2006-03-12
Final Drill Date: 2006-03-13
Well Total Depth: 659.00 m
Surface Hole Latitude: 51.459262
Surface Hole Longitude: -113.475005

For data sources see[1][2]

Well History

Date Event
2005-12-21 Obtained License
2006-03-12 Surface Casing Operation Performed
2006-03-13 Finished Drilling
2006-03-13 Production Casing Operation Performed
2006-03-13 Well Mode changed to Drilled and Cased
2006-03-14 Rig Released
2006-03-20 Well Log Performed
2006-05-18 Perforation Treatment Performed - Jet Perforation
2006-05-25 Perforation Treatment Performed - Fractured
2006-05-31 Well Began Production
2006-05-31 Well Fluid changed to Coalbed Methane-Coals Only
2006-05-31 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-05-18 Perforation 206.60 207.10 20
2006-05-18 Perforation 448.00 448.50 20
2006-05-18 Perforation 450.40 451.40 20
2006-05-18 Perforation 462.20 463.70 20
2006-05-18 Perforation 473.00 473.50 20
2006-05-18 Perforation 476.00 481.00 20
2006-05-18 Perforation 499.00 499.50 20
2006-05-18 Perforation 503.50 504.50 20
2006-05-18 Perforation 518.20 518.70 20
2006-05-18 Perforation 526.70 527.10 20
2006-05-18 Perforation 547.50 550.50 20
2006-05-18 Perforation 208.30 209.30 20
2006-05-18 Perforation 560.50 562.00 20
2006-05-18 Perforation 563.90 564.40 20
2006-05-18 Perforation 574.30 575.30 20
2006-05-18 Perforation 582.30 583.30 20
2006-05-18 Perforation 594.80 595.30 20
2006-05-18 Perforation 602.50 603.50 20
2006-05-18 Perforation 613.50 614.00 20
2006-05-25 Fracture 206.60 614.00 0
2006-05-18 Perforation 213.20 214.20 20
2006-05-18 Perforation 216.60 217.60 20
2006-05-18 Perforation 224.00 225.00 20
2006-05-18 Perforation 265.00 265.50 20
2006-05-18 Perforation 330.50 331.00 20
2006-05-18 Perforation 385.50 386.00 20
2006-05-18 Perforation 393.50 394.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5160 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8397 0.0 0.0 0.0
2010 8515 0.0 0.0 0.0
2011 8672 0.0 0.0 0.0
2012 8708 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8609 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References