X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294241608000

Well Details

Well ID: 0294241608000
Loading map...
Location: 00/08-16-029-24W4/0
Location Alias: 00/08-16-29-24 W4M
Location Alias 2: 00/08-16-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 16
County/Municipality: Kneehill County
Well Name: ANDEX ET AL SWALWELL 8-16-29-24
Operator Name: Bumper Development Corporation Ltd.
License Number: 0094696
License Date: 1982-04-02
License Status: RecCertified
Spud Date: 1982-04-27
Final Drill Date: 1982-05-09
Well Total Depth: 1674.00 m
Surface Hole Latitude: 51.478640
Surface Hole Longitude: -113.315251

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-04-02 Obtained License
1982-05-03 Drill Stem Test Performed
1982-05-05 Drill Stem Test Performed
1982-05-09 Finished Drilling
1982-05-09 Well Mode changed to Drilled and Cased
1982-05-10 Drill Stem Test Performed
1982-05-11 Production Casing Operation Performed
1982-05-21 Perforation Treatment Performed - Jet Perforation
1982-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-27 Perforation Treatment Performed - Jet Perforation
1982-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-07 Well Began Production
1982-07-07 Well Fluid changed to Crude Oil
1982-07-07 Well Mode changed to Pumping
1982-11-01 Well Fluid changed to Crude Oil
1982-11-01 Well Mode changed to Suspended
1986-12-11 Well Log Performed
1986-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-12 Plug Back Performed
1986-12-12 Well Abandoned
1986-12-12 Well Fluid changed to Crude Oil
1986-12-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-05-21 Perforation 1617.20 1622.40 13
1982-05-21 Perforation 1623.40 1625.30 13
1982-05-22 Acid Treatment 1617.20 1625.30 0
1982-05-27 Perforation 1598.20 1599.00 13
1982-05-27 Perforation 1610.20 1611.00 13
1982-05-27 Perforation 1612.50 1615.00 13
1982-05-28 Acid Treatment 1598.20 1615.00 0
1986-12-12 Packing Device Capped w/Cement 1587.00 1595.00 0
1986-12-12 Packing Device Capped w/Cement 822.00 830.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1556 0.0 0.0 0.0

For data sources see[5]

References