If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294241410020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.487531,"lon":-113.278922,"icon":""}]} |
Location: 02/10-14-029-24W4/0 | |
Location Alias: 02/10-14-29-24 W4M | |
Location Alias 2: 02/10-14-029-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 24 | |
Section: 14 | |
County/Municipality: Kneehill County | |
Well Name: PIONEER SWALWELL 10-14-29-24 | |
Operator Name: TAQA North Ltd. | |
License Number: 0192476 | |
License Date: 1996-10-18 | |
License Status: Suspension | |
Spud Date: 1996-10-30 | |
Final Drill Date: 1996-11-19 | |
Well Total Depth: 2445.00 m | |
Surface Hole Latitude: 51.487531 | |
Surface Hole Longitude: -113.278922 |
Date | Event |
---|---|
1996-10-18 | Obtained License |
1996-10-31 | Surface Casing Operation Performed |
1996-11-06 | Direction Drilling Operation Performed - Horizontal |
1996-11-13 | Production Casing Operation Performed |
1996-11-19 | Finished Drilling |
1996-11-19 | Perforation Treatment Performed - Open-Hole Completion |
1996-11-19 | Well Mode changed to Drilled and Cased |
1996-11-20 | Rig Released |
1996-11-25 | Well Log Performed |
1996-11-28 | Well Log Performed |
1996-12-01 | Well Began Production |
1996-12-01 | Well Fluid changed to Crude Oil |
1996-12-01 | Well Mode changed to Pumping |
1997-08-12 | Well Log Performed |
2009-03-14 | Well Fluid changed to Crude Oil |
2009-03-14 | Well Log Performed |
2009-03-14 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-11-06 | 1810.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-11-19 | Open Hole/Barefoot Completion | 2068.00 | 2445.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 411 | 0.0 | 0.0 | 0.0 |
1997 | 3652 | 0.0 | 0.0 | 0.0 |
1998 | 1893 | 0.0 | 0.0 | 0.0 |
2002 | 2550 | 0.0 | 0.0 | 0.0 |
2003 | 7219 | 0.0 | 0.0 | 0.0 |
2004 | 8540 | 0.0 | 0.0 | 0.0 |
2005 | 8300 | 0.0 | 0.0 | 0.0 |
2006 | 4055 | 0.0 | 0.0 | 0.0 |
2007 | 3174 | 0.0 | 0.0 | 0.0 |
For data sources see[6]