X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294241215000

Well Details

Well ID: 0294241215000
Loading map...
Location: 00/15-12-029-24W4/0
Location Alias: 00/15-12-29-24 W4M
Location Alias 2: 00/15-12-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 12
County/Municipality: Kneehill County
Well Name: PIONEER SWALWELL 15-12-29-24
Operator Name: TAQA North Ltd.
License Number: 0336336
License Date: 2005-08-12
License Status: Issued
Spud Date: 2005-11-15
Final Drill Date: 2005-11-17
Well Total Depth: 512.00 m
Surface Hole Latitude: 51.472201
Surface Hole Longitude: -113.246754

For data sources see[1][2]

Well History

Date Event
2005-08-12 Obtained License
2005-11-15 Surface Casing Operation Performed
2005-11-17 Finished Drilling
2005-11-17 Production Casing Operation Performed
2005-11-17 Rig Released
2005-11-17 Well Mode changed to Drilled and Cased
2005-11-26 Well Log Performed
2006-01-19 Perforation Treatment Performed - Jet Perforation
2006-01-23 Perforation Treatment Performed - Fractured
2006-08-14 Well Began Production
2006-08-14 Well Fluid changed to Coalbed Methane-Coals Only
2006-08-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-19 Perforation 185.30 185.80 14
2006-01-19 Perforation 312.80 313.30 14
2006-01-19 Perforation 314.00 314.50 14
2006-01-19 Perforation 322.50 323.00 14
2006-01-19 Perforation 325.40 325.90 14
2006-01-19 Perforation 328.30 329.30 14
2006-01-19 Perforation 332.30 332.80 14
2006-01-19 Perforation 346.60 347.60 14
2006-01-19 Perforation 354.00 354.50 14
2006-01-19 Perforation 361.50 362.50 14
2006-01-19 Perforation 367.00 367.50 14
2006-01-19 Perforation 198.00 198.50 14
2006-01-19 Perforation 374.30 377.30 14
2006-01-19 Perforation 405.00 405.50 14
2006-01-19 Perforation 413.70 414.20 14
2006-01-19 Perforation 418.40 418.90 14
2006-01-19 Perforation 427.70 428.70 14
2006-01-19 Perforation 434.30 435.30 14
2006-01-19 Perforation 445.20 445.70 14
2006-01-19 Perforation 454.40 454.90 14
2006-01-19 Perforation 456.80 457.30 14
2006-01-19 Perforation 472.60 473.60 14
2006-01-19 Perforation 207.80 208.30 14
2006-01-19 Perforation 475.40 475.90 14
2006-01-23 Fracture 185.30 475.90 0
2006-01-19 Perforation 215.00 216.00 14
2006-01-19 Perforation 237.70 238.70 14
2006-01-19 Perforation 256.00 256.50 14
2006-01-19 Perforation 269.50 270.50 14
2006-01-19 Perforation 304.40 304.90 14
2006-01-19 Perforation 310.10 311.10 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3360 0.0 0.0 0.0
2007 8731 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8635 0.0 0.0 0.0
2010 8521 0.0 0.0 0.0
2011 8654 0.0 0.0 0.0
2012 8694 0.0 0.0 0.0
2013 6576 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References