X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294241108020

Well Details

Well ID: 0294241108020
Loading map...
Location: 02/08-11-029-24W4/0
Location Alias: 02/08-11-29-24 W4M
Location Alias 2: 02/08-11-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 11
County/Municipality: Kneehill County
Well Name: EMBER 102 SWALWELL 8-11-29-24
Operator Name: Ember Resources Inc.
License Number: 0084381
License Date: 1980-07-23
License Status: Suspension
Spud Date: 1980-08-01
Final Drill Date: 1980-08-14
Well Total Depth: 1660.00 m
Surface Hole Latitude: 51.463712
Surface Hole Longitude: -113.268135

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-23 Obtained License
1980-08-06 Drill Stem Test Performed
1980-08-09 Drill Stem Test Performed
1980-08-14 Finished Drilling
1980-08-15 Drill Stem Test Performed
1980-08-15 Well Log Performed
1980-08-16 Drill Stem Test Performed
1980-08-17 Production Casing Operation Performed
1980-09-07 Perforation Treatment Performed - Jet Perforation
1980-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-10 Perforation Treatment Performed - Jet Perforation
1980-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-07 Well Mode changed to Drilled and Cased
1981-12-02 Well Began Production
1981-12-02 Well Fluid changed to Gas
1981-12-02 Well Mode changed to Flowing
1998-01-01 Well Fluid changed to Gas
1998-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-07 Perforation 1629.50 1631.50 3
1980-09-07 Perforation 1633.00 1634.50 3
1980-09-07 Perforation 1641.30 1642.20 3
1980-09-08 Acid Treatment 1629.50 1642.20 0
1980-09-10 Packing Device Capped w/Cement 1613.00 1620.00 0
1980-09-10 Perforation 1590.80 1594.50 3
1980-09-11 Acid Treatment 1590.80 1594.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 720 0.0 0.0 0.0
1982 8665 0.0 0.0 0.0
1983 8549 0.0 0.0 0.0
1984 8431 0.0 0.0 0.0
1985 8240 0.0 0.0 0.0
1986 8442 0.0 0.0 0.0
1987 8015 0.0 0.0 0.0
1988 8268 0.0 0.0 0.0
1989 8739 0.0 0.0 0.0
1990 8226 0.0 0.0 0.0
1991 7850 0.0 0.0 0.0
1992 7873 0.0 0.0 0.0
1993 8693 0.0 0.0 0.0
1994 6718 0.0 0.0 0.0

For data sources see[5]

References