X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240808000

Well Details

Well ID: 0294240808000
Loading map...
Location: 00/08-08-029-24W4/0
Location Alias: 00/08-08-29-24 W4M
Location Alias 2: 00/08-08-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 08
County/Municipality: Kneehill County
Well Name: ANDEX ET AL SWALWELL 8-8-29-24
Operator Name: Marathon Canada Limited
License Number: 0085145
License Date: 1980-08-22
License Status: RecCertified
Spud Date: 1980-08-29
Final Drill Date: 1980-09-07
Well Total Depth: 1732.00 m
Surface Hole Latitude: 51.466457
Surface Hole Longitude: -113.336637

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-22 Obtained License
1980-09-07 Finished Drilling
1980-09-07 Well Log Performed
1980-09-07 Well Mode changed to Drilled and Cased
1980-09-08 Drill Stem Test Performed
1980-09-09 Drill Stem Test Performed
1980-09-11 Production Casing Operation Performed
1980-09-19 Well Log Performed
1980-09-20 Perforation Treatment Performed - Jet Perforation
1980-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-10 Well Began Production
1980-10-10 Well Fluid changed to Crude Oil
1980-10-10 Well Mode changed to Pumping
1984-02-01 Well Fluid changed to Crude Oil
1984-02-01 Well Mode changed to Suspended
1993-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-22 Perforation Treatment Performed - Jet Perforation
1993-10-22 Plug Back Performed
1993-10-22 Well Log Performed
1993-10-24 Perforation Treatment Performed - Remedial Casing
1993-10-24 Well Fluid changed to Crude Oil
1993-10-24 Well Mode changed to Abandoned
1993-10-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-20 Perforation 1661.50 1663.00 6
1980-09-20 Perforation 1668.20 1672.30 6
1980-09-21 Acid Treatment 1661.50 1672.30 0
1993-10-22 Packing Device Capped w/Cement 1647.00 1655.00 0
1993-10-22 Perforation 304.00 304.50 16
1993-10-24 Remedial Casing Cementing 304.00 304.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 609 0.0 0.0 0.0
1981 2932 0.0 0.0 0.0
1982 3984 0.0 0.0 0.0
1983 6936 0.0 0.0 0.0
1984 633 0.0 0.0 0.0

For data sources see[5]

References