X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240801000

Well Details

Well ID: 0294240801000
Loading map...
Location: 00/01-08-029-24W4/0
Location Alias: 00/01-08-29-24 W4M
Location Alias 2: 00/01-08-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 08
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 1-8-29-24
Operator Name: Ember Resources Inc.
License Number: 0336614
License Date: 2005-08-17
License Status: Issued
Spud Date: 2005-09-02
Final Drill Date: 2005-09-03
Well Total Depth: 894.00 m
Surface Hole Latitude: 51.461692
Surface Hole Longitude: -113.338865

For data sources see[1][2]

Well History

Date Event
2005-08-17 Obtained License
2005-09-02 Surface Casing Operation Performed
2005-09-03 Finished Drilling
2005-09-03 Production Casing Operation Performed
2005-09-03 Rig Released
2005-09-03 Well Mode changed to Drilled and Cased
2005-09-23 Well Log Performed
2005-10-05 Perforation Treatment Performed - Jet Perforation
2005-10-12 Perforation Treatment Performed - Fractured
2006-01-23 Well Began Production
2006-01-23 Well Fluid changed to Coalbed Methane-Coals and Other
2006-01-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-05 Perforation 228.00 231.00 14
2005-10-05 Perforation 446.80 447.30 14
2005-10-05 Perforation 452.00 454.00 14
2005-10-05 Perforation 477.80 478.30 14
2005-10-05 Perforation 491.50 492.00 14
2005-10-05 Perforation 495.80 496.30 14
2005-10-05 Perforation 507.10 508.10 14
2005-10-05 Perforation 515.50 516.00 14
2005-10-05 Perforation 521.90 523.40 14
2005-10-05 Perforation 530.00 531.00 14
2005-10-05 Perforation 547.00 547.50 14
2005-10-05 Perforation 231.50 235.00 14
2005-10-12 Fracture 547.00 547.50 0
2005-10-12 Fracture 530.00 531.00 0
2005-10-12 Fracture 521.90 523.40 0
2005-10-12 Fracture 515.50 516.00 0
2005-10-12 Fracture 507.10 508.10 0
2005-10-12 Fracture 495.80 496.30 0
2005-10-12 Fracture 491.50 492.00 0
2005-10-12 Fracture 477.80 478.30 0
2005-10-12 Fracture 452.00 454.00 0
2005-10-12 Fracture 446.80 447.30 0
2005-10-05 Perforation 270.00 270.50 14
2005-10-12 Fracture 431.90 436.00 0
2005-10-12 Fracture 410.00 411.00 0
2005-10-12 Fracture 390.50 391.00 0
2005-10-12 Fracture 380.90 381.40 0
2005-10-12 Fracture 329.00 330.00 0
2005-10-12 Fracture 270.00 270.50 0
2005-10-12 Fracture 231.50 235.00 0
2005-10-12 Fracture 228.00 231.00 0
2005-10-05 Perforation 329.00 330.00 14
2005-10-05 Perforation 380.90 381.40 14
2005-10-05 Perforation 390.50 391.00 14
2005-10-05 Perforation 410.00 411.00 14
2005-10-05 Perforation 431.90 432.40 14
2005-10-05 Perforation 434.00 436.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6096 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8063 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8601 0.0 0.0 0.0
2012 8755 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8755 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8169 0.0 0.0 0.0
2018 5366 0.0 0.0 0.0
2019 8312 0.0 0.0 0.0
2020 2030 0.0 0.0 0.0

For data sources see[5]

References