If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294240612002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.456052,"lon":-113.375819,"icon":""}]} |
Location: 00/12-06-029-24W4/2 | |
Location Alias: 00/12-06-29-24 W4M | |
Location Alias 2: 00/12-06-029-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 24 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 12-6-29-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411235 | |
License Date: 2009-06-30 | |
License Status: Issued | |
Spud Date: 2009-08-02 | |
Final Drill Date: 2009-08-04 | |
Well Total Depth: 915.00 m | |
Surface Hole Latitude: 51.456052 | |
Surface Hole Longitude: -113.375819 |
Date | Event |
---|---|
2009-06-30 | Obtained License |
2009-08-02 | Surface Casing Operation Performed |
2009-08-04 | Finished Drilling |
2009-08-04 | Production Casing Operation Performed |
2009-08-04 | Rig Released |
2009-08-04 | Well Mode changed to Drilled and Cased |
2009-09-03 | Well Log Performed |
2009-09-16 | Perforation Treatment Performed - Jet Perforation |
2009-10-15 | Perforation Treatment Performed - Jet Perforation |
2009-10-19 | Perforation Treatment Performed - Fractured |
2009-11-02 | Well Began Production |
2009-11-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-02 | Well Mode changed to Flowing |
2017-03-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-23 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-09-16 | Perforation | 820.30 | 821.30 | 13 |
2009-10-15 | Perforation | 469.70 | 470.70 | 13 |
2009-10-15 | Perforation | 474.60 | 475.60 | 13 |
2009-10-15 | Perforation | 503.30 | 503.80 | 13 |
2009-10-15 | Perforation | 515.30 | 515.80 | 13 |
2009-10-15 | Perforation | 523.40 | 524.40 | 13 |
2009-10-15 | Perforation | 536.40 | 537.40 | 13 |
2009-10-15 | Perforation | 548.80 | 549.80 | 13 |
2009-10-15 | Perforation | 568.80 | 569.80 | 13 |
2009-10-15 | Perforation | 571.80 | 573.30 | 13 |
2009-10-19 | Fracture | 571.80 | 573.30 | 0 |
2009-10-15 | Perforation | 222.00 | 222.50 | 13 |
2009-10-19 | Fracture | 568.80 | 569.80 | 0 |
2009-10-19 | Fracture | 548.80 | 549.80 | 0 |
2009-10-19 | Fracture | 536.40 | 537.40 | 0 |
2009-10-19 | Fracture | 523.40 | 524.40 | 0 |
2009-10-19 | Fracture | 515.30 | 515.80 | 0 |
2009-10-19 | Fracture | 503.30 | 503.80 | 0 |
2009-10-19 | Fracture | 474.60 | 475.60 | 0 |
2009-10-19 | Fracture | 469.70 | 470.70 | 0 |
2009-10-19 | Fracture | 461.90 | 462.40 | 0 |
2009-10-19 | Fracture | 455.70 | 457.20 | 0 |
2009-10-15 | Perforation | 280.70 | 281.20 | 13 |
2009-10-19 | Fracture | 429.20 | 429.70 | 0 |
2009-10-19 | Fracture | 408.30 | 408.80 | 0 |
2009-10-19 | Fracture | 398.10 | 398.60 | 0 |
2009-10-19 | Fracture | 345.80 | 346.30 | 0 |
2009-10-19 | Fracture | 280.70 | 281.20 | 0 |
2009-10-19 | Fracture | 222.00 | 222.50 | 0 |
2009-10-15 | Perforation | 345.80 | 346.30 | 13 |
2009-10-15 | Perforation | 398.10 | 398.60 | 13 |
2009-10-15 | Perforation | 408.30 | 408.80 | 13 |
2009-10-15 | Perforation | 429.20 | 429.70 | 13 |
2009-10-15 | Perforation | 455.70 | 457.20 | 13 |
2009-10-15 | Perforation | 461.90 | 462.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1464 | 0.0 | 0.0 | 0.0 |
2010 | 8735 | 0.0 | 0.0 | 0.0 |
2011 | 7955 | 0.0 | 0.0 | 0.0 |
2012 | 8427 | 0.0 | 0.0 | 0.0 |
2013 | 8518 | 0.0 | 0.0 | 0.0 |
2014 | 8523 | 0.0 | 0.0 | 0.0 |
2015 | 8736 | 0.0 | 0.0 | 0.0 |
2016 | 8758 | 0.0 | 0.0 | 0.0 |
2017 | 8135 | 0.0 | 0.0 | 0.0 |
2018 | 5312 | 0.0 | 0.0 | 0.0 |
2019 | 8312 | 0.0 | 0.0 | 0.0 |
2020 | 2030 | 0.0 | 0.0 | 0.0 |
For data sources see[5]