X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240510000

Well Details

Well ID: 0294240510000
Loading map...
Location: 00/10-05-029-24W4/0
Location Alias: 00/10-05-29-24 W4M
Location Alias 2: 00/10-05-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 10-5-29-24
Operator Name: Ember Resources Inc.
License Number: 0411226
License Date: 2009-06-30
License Status: Issued
Spud Date: 2009-07-22
Final Drill Date: 2009-07-24
Well Total Depth: 915.00 m
Surface Hole Latitude: 51.455734
Surface Hole Longitude: -113.340194

For data sources see[1][2]

Well History

Date Event
2009-06-30 Obtained License
2009-07-23 Surface Casing Operation Performed
2009-07-24 Finished Drilling
2009-07-24 Production Casing Operation Performed
2009-07-24 Rig Released
2009-07-24 Well Mode changed to Drilled and Cased
2009-08-31 Well Log Performed
2009-10-03 Perforation Treatment Performed - Jet Perforation
2009-10-09 Perforation Treatment Performed - Jet Perforation
2009-10-19 Perforation Treatment Performed - Fractured
2009-11-04 Well Began Production
2009-11-04 Well Fluid changed to Coalbed Methane-Coals and Other
2009-11-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-03 Perforation 533.00 533.50 13
2009-10-09 Perforation 419.30 420.30 13
2009-10-09 Perforation 429.20 429.70 13
2009-10-09 Perforation 439.50 440.00 13
2009-10-09 Perforation 442.00 443.50 13
2009-10-09 Perforation 458.00 459.00 13
2009-10-09 Perforation 462.80 464.30 13
2009-10-09 Perforation 490.50 491.00 13
2009-10-09 Perforation 495.60 496.10 13
2009-10-09 Perforation 508.80 509.30 13
2009-10-09 Perforation 518.00 519.00 13
2009-10-03 Perforation 627.00 630.00 13
2009-10-09 Perforation 526.20 526.70 13
2009-10-09 Perforation 534.20 534.70 13
2009-10-09 Perforation 540.20 541.20 13
2009-10-09 Perforation 558.20 558.70 13
2009-10-09 Perforation 559.90 560.40 13
2009-10-19 Fracture 558.20 560.40 0
2009-10-19 Fracture 540.20 541.20 0
2009-10-19 Fracture 533.00 534.70 0
2009-10-19 Fracture 526.20 526.70 0
2009-10-19 Fracture 518.00 519.00 0
2009-10-03 Perforation 631.40 632.40 13
2009-10-19 Fracture 508.80 509.30 0
2009-10-19 Fracture 495.60 496.10 0
2009-10-19 Fracture 490.50 491.00 0
2009-10-19 Fracture 462.80 464.30 0
2009-10-19 Fracture 458.00 459.00 0
2009-10-19 Fracture 442.00 443.50 0
2009-10-19 Fracture 439.50 440.00 0
2009-10-19 Fracture 429.20 429.70 0
2009-10-19 Fracture 419.30 420.30 0
2009-10-19 Fracture 400.30 401.30 0
2009-10-03 Perforation 673.80 674.80 13
2009-10-19 Fracture 388.30 389.30 0
2009-10-19 Fracture 337.50 338.00 0
2009-10-19 Fracture 273.50 274.20 0
2009-10-19 Fracture 214.30 214.80 0
2009-10-09 Perforation 214.30 214.80 13
2009-10-09 Perforation 273.50 274.20 13
2009-10-09 Perforation 337.50 338.00 13
2009-10-09 Perforation 388.30 389.30 13
2009-10-09 Perforation 400.30 401.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1392 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8746 0.0 0.0 0.0
2012 8384 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8678 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 7957 0.0 0.0 0.0
2018 5404 0.0 0.0 0.0
2019 6520 0.0 0.0 0.0
2020 2116 0.0 0.0 0.0

For data sources see[5]

References