If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294240510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.455734,"lon":-113.340194,"icon":""}]} |
Location: 00/10-05-029-24W4/0 | |
Location Alias: 00/10-05-29-24 W4M | |
Location Alias 2: 00/10-05-029-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 10-5-29-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411226 | |
License Date: 2009-06-30 | |
License Status: Issued | |
Spud Date: 2009-07-22 | |
Final Drill Date: 2009-07-24 | |
Well Total Depth: 915.00 m | |
Surface Hole Latitude: 51.455734 | |
Surface Hole Longitude: -113.340194 |
Date | Event |
---|---|
2009-06-30 | Obtained License |
2009-07-23 | Surface Casing Operation Performed |
2009-07-24 | Finished Drilling |
2009-07-24 | Production Casing Operation Performed |
2009-07-24 | Rig Released |
2009-07-24 | Well Mode changed to Drilled and Cased |
2009-08-31 | Well Log Performed |
2009-10-03 | Perforation Treatment Performed - Jet Perforation |
2009-10-09 | Perforation Treatment Performed - Jet Perforation |
2009-10-19 | Perforation Treatment Performed - Fractured |
2009-11-04 | Well Began Production |
2009-11-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-03 | Perforation | 533.00 | 533.50 | 13 |
2009-10-09 | Perforation | 419.30 | 420.30 | 13 |
2009-10-09 | Perforation | 429.20 | 429.70 | 13 |
2009-10-09 | Perforation | 439.50 | 440.00 | 13 |
2009-10-09 | Perforation | 442.00 | 443.50 | 13 |
2009-10-09 | Perforation | 458.00 | 459.00 | 13 |
2009-10-09 | Perforation | 462.80 | 464.30 | 13 |
2009-10-09 | Perforation | 490.50 | 491.00 | 13 |
2009-10-09 | Perforation | 495.60 | 496.10 | 13 |
2009-10-09 | Perforation | 508.80 | 509.30 | 13 |
2009-10-09 | Perforation | 518.00 | 519.00 | 13 |
2009-10-03 | Perforation | 627.00 | 630.00 | 13 |
2009-10-09 | Perforation | 526.20 | 526.70 | 13 |
2009-10-09 | Perforation | 534.20 | 534.70 | 13 |
2009-10-09 | Perforation | 540.20 | 541.20 | 13 |
2009-10-09 | Perforation | 558.20 | 558.70 | 13 |
2009-10-09 | Perforation | 559.90 | 560.40 | 13 |
2009-10-19 | Fracture | 558.20 | 560.40 | 0 |
2009-10-19 | Fracture | 540.20 | 541.20 | 0 |
2009-10-19 | Fracture | 533.00 | 534.70 | 0 |
2009-10-19 | Fracture | 526.20 | 526.70 | 0 |
2009-10-19 | Fracture | 518.00 | 519.00 | 0 |
2009-10-03 | Perforation | 631.40 | 632.40 | 13 |
2009-10-19 | Fracture | 508.80 | 509.30 | 0 |
2009-10-19 | Fracture | 495.60 | 496.10 | 0 |
2009-10-19 | Fracture | 490.50 | 491.00 | 0 |
2009-10-19 | Fracture | 462.80 | 464.30 | 0 |
2009-10-19 | Fracture | 458.00 | 459.00 | 0 |
2009-10-19 | Fracture | 442.00 | 443.50 | 0 |
2009-10-19 | Fracture | 439.50 | 440.00 | 0 |
2009-10-19 | Fracture | 429.20 | 429.70 | 0 |
2009-10-19 | Fracture | 419.30 | 420.30 | 0 |
2009-10-19 | Fracture | 400.30 | 401.30 | 0 |
2009-10-03 | Perforation | 673.80 | 674.80 | 13 |
2009-10-19 | Fracture | 388.30 | 389.30 | 0 |
2009-10-19 | Fracture | 337.50 | 338.00 | 0 |
2009-10-19 | Fracture | 273.50 | 274.20 | 0 |
2009-10-19 | Fracture | 214.30 | 214.80 | 0 |
2009-10-09 | Perforation | 214.30 | 214.80 | 13 |
2009-10-09 | Perforation | 273.50 | 274.20 | 13 |
2009-10-09 | Perforation | 337.50 | 338.00 | 13 |
2009-10-09 | Perforation | 388.30 | 389.30 | 13 |
2009-10-09 | Perforation | 400.30 | 401.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1392 | 0.0 | 0.0 | 0.0 |
2010 | 8756 | 0.0 | 0.0 | 0.0 |
2011 | 8746 | 0.0 | 0.0 | 0.0 |
2012 | 8384 | 0.0 | 0.0 | 0.0 |
2013 | 8730 | 0.0 | 0.0 | 0.0 |
2014 | 8599 | 0.0 | 0.0 | 0.0 |
2015 | 8678 | 0.0 | 0.0 | 0.0 |
2016 | 8616 | 0.0 | 0.0 | 0.0 |
2017 | 7957 | 0.0 | 0.0 | 0.0 |
2018 | 5404 | 0.0 | 0.0 | 0.0 |
2019 | 6520 | 0.0 | 0.0 | 0.0 |
2020 | 2116 | 0.0 | 0.0 | 0.0 |
For data sources see[5]