If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294240507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.449102,"lon":-113.3402,"icon":""}]} |
Location: 00/07-05-029-24W4/0 | |
Location Alias: 00/07-05-29-24 W4M | |
Location Alias 2: 00/07-05-029-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 7-5-29-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410951 | |
License Date: 2009-06-12 | |
License Status: Issued | |
Spud Date: 2009-07-29 | |
Final Drill Date: 2009-07-30 | |
Well Total Depth: 920.00 m | |
Surface Hole Latitude: 51.449102 | |
Surface Hole Longitude: -113.340200 |
Date | Event |
---|---|
2009-06-12 | Obtained License |
2009-07-30 | Finished Drilling |
2009-07-30 | Production Casing Operation Performed |
2009-07-30 | Surface Casing Operation Performed |
2009-07-30 | Well Mode changed to Drilled and Cased |
2009-07-31 | Rig Released |
2009-09-01 | Well Log Performed |
2009-09-16 | Perforation Treatment Performed - Jet Perforation |
2009-09-30 | Perforation Treatment Performed - Jet Perforation |
2009-10-06 | Perforation Treatment Performed - Fractured |
2009-11-04 | Well Began Production |
2009-11-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-09-16 | Perforation | 638.60 | 641.10 | 13 |
2009-09-30 | Perforation | 465.00 | 466.00 | 13 |
2009-09-30 | Perforation | 466.60 | 467.10 | 13 |
2009-09-30 | Perforation | 470.40 | 471.40 | 13 |
2009-09-30 | Perforation | 511.10 | 511.60 | 13 |
2009-09-30 | Perforation | 515.60 | 516.60 | 13 |
2009-09-30 | Perforation | 523.70 | 525.20 | 13 |
2009-09-30 | Perforation | 531.90 | 532.40 | 13 |
2009-09-30 | Perforation | 539.50 | 540.00 | 13 |
2009-09-30 | Perforation | 541.60 | 542.10 | 13 |
2009-09-30 | Perforation | 548.60 | 549.10 | 13 |
2009-09-30 | Perforation | 215.40 | 215.90 | 13 |
2009-09-30 | Perforation | 566.40 | 566.90 | 13 |
2009-09-30 | Perforation | 567.80 | 568.30 | 13 |
2009-10-06 | Fracture | 566.40 | 568.30 | 0 |
2009-10-06 | Fracture | 548.60 | 549.10 | 0 |
2009-10-06 | Fracture | 541.60 | 542.10 | 0 |
2009-10-06 | Fracture | 539.50 | 540.00 | 0 |
2009-10-06 | Fracture | 531.90 | 532.40 | 0 |
2009-10-06 | Fracture | 523.70 | 525.20 | 0 |
2009-10-06 | Fracture | 515.60 | 516.60 | 0 |
2009-10-06 | Fracture | 511.10 | 511.60 | 0 |
2009-09-30 | Perforation | 270.20 | 270.70 | 13 |
2009-10-06 | Fracture | 470.40 | 471.40 | 0 |
2009-10-06 | Fracture | 465.00 | 467.10 | 0 |
2009-10-06 | Fracture | 452.30 | 453.80 | 0 |
2009-10-06 | Fracture | 449.90 | 450.40 | 0 |
2009-10-06 | Fracture | 428.30 | 429.30 | 0 |
2009-10-06 | Fracture | 407.70 | 408.20 | 0 |
2009-10-06 | Fracture | 281.70 | 282.20 | 0 |
2009-10-06 | Fracture | 277.20 | 277.70 | 0 |
2009-10-06 | Fracture | 270.20 | 270.70 | 0 |
2009-10-06 | Fracture | 215.40 | 215.90 | 0 |
2009-09-30 | Perforation | 277.20 | 277.70 | 13 |
2009-09-30 | Perforation | 281.70 | 282.20 | 13 |
2009-09-30 | Perforation | 407.70 | 408.20 | 13 |
2009-09-30 | Perforation | 428.30 | 429.30 | 13 |
2009-09-30 | Perforation | 449.90 | 450.40 | 13 |
2009-09-30 | Perforation | 452.30 | 453.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1392 | 0.0 | 0.0 | 0.0 |
2010 | 8756 | 0.0 | 0.0 | 0.0 |
2011 | 8700 | 0.0 | 0.0 | 0.0 |
2012 | 8319 | 0.0 | 0.0 | 0.0 |
2013 | 8730 | 0.0 | 0.0 | 0.0 |
2014 | 8599 | 0.0 | 0.0 | 0.0 |
2015 | 8676 | 0.0 | 0.0 | 0.0 |
2016 | 8616 | 0.0 | 0.0 | 0.0 |
2017 | 7957 | 0.0 | 0.0 | 0.0 |
2018 | 5404 | 0.0 | 0.0 | 0.0 |
2019 | 6520 | 0.0 | 0.0 | 0.0 |
2020 | 2116 | 0.0 | 0.0 | 0.0 |
For data sources see[5]