X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240506000

Well Details

Well ID: 0294240506000
Loading map...
Location: 00/06-05-029-24W4/0
Location Alias: 00/06-05-29-24 W4M
Location Alias 2: 00/06-05-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 6-5-29-24
Operator Name: Ember Resources Inc.
License Number: 0410950
License Date: 2009-06-12
License Status: Issued
Spud Date: 2009-07-26
Final Drill Date: 2009-07-27
Well Total Depth: 919.00 m
Surface Hole Latitude: 51.452036
Surface Hole Longitude: -113.345842

For data sources see[1][2]

Well History

Date Event
2009-06-12 Obtained License
2009-07-26 Surface Casing Operation Performed
2009-07-27 Finished Drilling
2009-07-27 Production Casing Operation Performed
2009-07-27 Rig Released
2009-07-27 Well Mode changed to Drilled and Cased
2009-08-31 Well Log Performed
2009-09-30 Perforation Treatment Performed - Jet Perforation
2009-10-07 Perforation Treatment Performed - Fractured
2009-11-04 Well Began Production
2009-11-04 Well Fluid changed to Coalbed Methane-Coals and Other
2009-11-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-30 Perforation 206.00 206.50 13
2009-09-30 Perforation 440.80 441.30 13
2009-09-30 Perforation 443.20 444.20 13
2009-09-30 Perforation 455.80 456.80 13
2009-09-30 Perforation 461.40 462.90 13
2009-09-30 Perforation 493.00 493.50 13
2009-09-30 Perforation 505.90 506.40 13
2009-09-30 Perforation 514.30 515.30 13
2009-09-30 Perforation 531.10 531.60 13
2009-09-30 Perforation 532.90 533.40 13
2009-09-30 Perforation 539.20 540.70 13
2009-09-30 Perforation 264.50 265.00 13
2009-09-30 Perforation 556.70 557.20 13
2009-10-07 Fracture 556.70 557.20 0
2009-10-07 Fracture 539.20 540.70 0
2009-10-07 Fracture 531.10 533.40 0
2009-10-07 Fracture 514.30 515.30 0
2009-10-07 Fracture 505.90 506.40 0
2009-10-07 Fracture 493.00 493.50 0
2009-10-07 Fracture 461.40 462.90 0
2009-10-07 Fracture 455.80 456.80 0
2009-10-07 Fracture 440.80 444.20 0
2009-09-30 Perforation 268.90 269.40 13
2009-10-07 Fracture 418.80 419.30 0
2009-10-07 Fracture 396.40 400.00 0
2009-10-07 Fracture 384.90 385.90 0
2009-10-07 Fracture 333.10 335.90 0
2009-10-07 Fracture 268.90 269.40 0
2009-10-07 Fracture 264.50 269.40 0
2009-10-07 Fracture 206.00 206.50 0
2009-09-30 Perforation 333.10 333.60 13
2009-09-30 Perforation 335.40 335.90 13
2009-09-30 Perforation 384.90 385.90 13
2009-09-30 Perforation 396.40 396.90 13
2009-09-30 Perforation 399.50 400.00 13
2009-09-30 Perforation 418.80 419.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1392 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8700 0.0 0.0 0.0
2012 8431 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8676 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 7957 0.0 0.0 0.0
2018 5404 0.0 0.0 0.0
2019 6520 0.0 0.0 0.0
2020 2116 0.0 0.0 0.0

For data sources see[5]

References