X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294233216000

Well Details

Well ID: 0294233216000
Loading map...
Location: 00/16-32-029-23W4/0
Location Alias: 00/16-32-29-23 W4M
Location Alias 2: 00/16-32-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 32
County/Municipality: Kneehill County
Well Name: ECA GPINE 16-32-29-23
Operator Name: Lynx Energy ULC
License Number: 0334758
License Date: 2005-07-18
License Status: Issued
Spud Date: 2005-07-25
Final Drill Date: 2005-08-03
Well Total Depth: 850.00 m
Surface Hole Latitude: 51.530360
Surface Hole Longitude: -113.193686

For data sources see[1][2]

Well History

Date Event
2005-07-18 Obtained License
2005-07-26 Surface Casing Operation Performed
2005-08-03 Finished Drilling
2005-08-03 Production Casing Operation Performed
2005-08-03 Rig Released
2005-08-03 Well Mode changed to Drilled and Cased
2005-08-09 Well Log Performed
2005-09-01 Perforation Treatment Performed - Jet Perforation
2005-09-07 Perforation Treatment Performed - Fractured
2005-11-03 Well Began Production
2005-11-03 Well Fluid changed to Coalbed Methane-Coals Only
2005-11-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-01 Perforation 228.30 228.80 13
2005-09-01 Perforation 462.00 463.00 13
2005-09-01 Perforation 469.00 470.00 13
2005-09-01 Perforation 476.50 477.50 13
2005-09-01 Perforation 482.50 484.00 13
2005-09-01 Perforation 493.00 495.50 13
2005-09-01 Perforation 514.70 515.20 13
2005-09-07 Fracture 514.70 515.20 0
2005-09-07 Fracture 493.00 495.50 0
2005-09-07 Fracture 482.50 484.00 0
2005-09-07 Fracture 476.50 477.50 0
2005-09-01 Perforation 307.70 308.20 13
2005-09-07 Fracture 469.00 470.00 0
2005-09-07 Fracture 462.00 463.00 0
2005-09-07 Fracture 443.70 444.20 0
2005-09-07 Fracture 409.00 410.50 0
2005-09-07 Fracture 405.50 406.50 0
2005-09-07 Fracture 399.50 400.00 0
2005-09-07 Fracture 393.50 395.00 0
2005-09-07 Fracture 364.70 366.70 0
2005-09-07 Fracture 346.50 349.00 0
2005-09-07 Fracture 307.70 308.20 0
2005-09-01 Perforation 346.50 349.00 13
2005-09-07 Fracture 228.30 228.80 0
2005-09-01 Perforation 364.70 366.70 13
2005-09-01 Perforation 393.50 395.00 13
2005-09-01 Perforation 399.50 400.00 13
2005-09-01 Perforation 405.50 406.50 13
2005-09-01 Perforation 409.00 410.50 13
2005-09-01 Perforation 443.70 444.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1416 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8638 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References