If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294232906022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.507524,"lon":-113.205272,"icon":""}]} |
Location: 02/06-29-029-23W4/2 | |
Location Alias: 02/06-29-29-23 W4M | |
Location Alias 2: 02/06-29-029-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 23 | |
Section: 29 | |
County/Municipality: Kneehill County | |
Well Name: ECA GPINE 6-29-29-23 | |
Operator Name: Lynx Energy ULC | |
License Number: 0335058 | |
License Date: 2005-07-21 | |
License Status: Amended | |
Spud Date: 2005-08-03 | |
Final Drill Date: 2005-08-03 | |
Well Total Depth: 837.00 m | |
Surface Hole Latitude: 51.507524 | |
Surface Hole Longitude: -113.205272 |
Date | Event |
---|---|
2005-07-21 | Obtained License |
2005-07-28 | Surface Casing Operation Performed |
2005-08-03 | Finished Drilling |
2005-08-03 | Production Casing Operation Performed |
2005-08-03 | Well Mode changed to Drilled and Cased |
2005-08-04 | Rig Released |
2005-08-09 | Well Log Performed |
2005-08-21 | Perforation Treatment Performed - Jet Perforation |
2005-08-29 | Perforation Treatment Performed - Jet Perforation |
2005-08-30 | Perforation Treatment Performed - Jet Perforation |
2005-09-01 | Perforation Treatment Performed - Fractured |
2005-10-28 | Well Began Production |
2005-10-28 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-10-28 | Well Mode changed to Flowing |
2008-02-13 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-21 | Perforation | 766.00 | 767.50 | 13 |
2005-08-29 | Perforation | 464.70 | 465.20 | 13 |
2005-08-29 | Perforation | 467.00 | 467.50 | 13 |
2005-08-29 | Perforation | 496.80 | 497.80 | 13 |
2005-08-30 | Perforation | 219.50 | 220.00 | 13 |
2005-08-30 | Perforation | 232.80 | 233.30 | 13 |
2005-08-30 | Perforation | 283.50 | 284.00 | 13 |
2005-08-30 | Perforation | 339.00 | 340.50 | 13 |
2005-08-30 | Perforation | 341.50 | 343.00 | 13 |
2005-08-30 | Perforation | 352.00 | 354.00 | 13 |
2005-08-30 | Perforation | 356.50 | 357.00 | 13 |
2005-08-21 | Perforation | 768.50 | 770.50 | 13 |
2005-08-30 | Perforation | 379.50 | 380.00 | 13 |
2005-09-01 | Fracture | 768.50 | 770.50 | 0 |
2005-09-01 | Fracture | 766.00 | 767.50 | 0 |
2005-09-01 | Fracture | 496.80 | 497.80 | 0 |
2005-09-01 | Fracture | 467.00 | 467.50 | 0 |
2005-09-01 | Fracture | 464.70 | 465.20 | 0 |
2005-09-01 | Fracture | 458.20 | 458.70 | 0 |
2005-09-01 | Fracture | 451.00 | 452.00 | 0 |
2005-09-01 | Fracture | 444.00 | 445.00 | 0 |
2005-09-01 | Fracture | 428.80 | 429.30 | 0 |
2005-08-29 | Perforation | 382.00 | 383.00 | 13 |
2005-09-01 | Fracture | 395.00 | 398.00 | 0 |
2005-09-01 | Fracture | 388.70 | 389.20 | 0 |
2005-09-01 | Fracture | 382.00 | 383.00 | 0 |
2005-09-01 | Fracture | 379.50 | 380.00 | 0 |
2005-09-01 | Fracture | 356.50 | 357.00 | 0 |
2005-09-01 | Fracture | 352.00 | 354.00 | 0 |
2005-09-01 | Fracture | 341.50 | 343.00 | 0 |
2005-09-01 | Fracture | 339.00 | 340.50 | 0 |
2005-09-01 | Fracture | 283.50 | 284.00 | 0 |
2005-09-01 | Fracture | 232.80 | 233.30 | 0 |
2005-08-29 | Perforation | 388.70 | 389.20 | 13 |
2005-09-01 | Fracture | 219.50 | 220.00 | 0 |
2005-08-29 | Perforation | 395.00 | 398.00 | 13 |
2005-08-29 | Perforation | 428.80 | 429.30 | 13 |
2005-08-29 | Perforation | 444.00 | 445.00 | 13 |
2005-08-29 | Perforation | 451.00 | 452.00 | 13 |
2005-08-29 | Perforation | 458.20 | 458.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1560 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 1440 | 0.0 | 0.0 | 0.0 |
For data sources see[5]