X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294231607000

Well Details

Well ID: 0294231607000
Loading map...
Location: 00/07-16-029-23W4/0
Location Alias: 00/07-16-29-23 W4M
Location Alias 2: 00/07-16-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 16
County/Municipality: Kneehill County
Well Name: ECA CARBON 7-16-29-23
Operator Name: Lynx Energy ULC
License Number: 0059370
License Date: 1976-07-26
License Status: Suspension
Spud Date: 1976-07-26
Final Drill Date: 1976-08-08
Well Total Depth: 1561.50 m
Surface Hole Latitude: 51.480973
Surface Hole Longitude: -113.180660

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-26 Obtained License
1976-07-29 Drill Stem Test Performed
1976-07-30 Drill Stem Test Performed
1976-08-01 Drill Stem Test Performed
1976-08-03 Drill Stem Test Performed
1976-08-08 Finished Drilling
1976-08-08 Well Mode changed to Drilled and Cased
1976-08-09 Drill Stem Test Performed
1976-08-10 Production Casing Operation Performed
1976-08-13 Well Log Performed
1976-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-15 Perforation Treatment Performed - Jet Perforation
1976-08-21 Well Began Production
1976-08-21 Well Fluid changed to Crude Oil
1976-08-21 Well Mode changed to Flowing
1976-09-13 Well Fluid changed to Crude Oil
1976-09-13 Well Mode changed to Suspended
1976-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-16 Perforation Treatment Performed - Jet Perforation
1976-09-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-15 Perforation 1505.40 1507.80 3
1976-08-15 Perforation 1514.20 1518.50 3
1976-08-15 Perforation 1520.00 1526.10 3
1976-08-15 Acid Treatment 1505.40 1526.10 0
1976-09-16 Perforation 1259.70 1260.70 7
1976-09-16 Perforation 1263.40 1264.30 7
1976-09-16 Acid Treatment 1259.70 1264.30 0
1976-09-19 Fracture 1259.70 1264.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 528 0.0 0.0 0.0

For data sources see[5]

References