X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294230306022

Well Details

Well ID: 0294230306022
Loading map...
Location: 02/06-03-029-23W4/2
Location Alias: 02/06-03-29-23 W4M
Location Alias 2: 02/06-03-029-23 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 03
County/Municipality: Kneehill County
Well Name: ECA CARBON 6-3-29-23
Operator Name: Lynx Energy ULC
License Number: 0058729
License Date: 1976-06-16
License Status: Issued
Spud Date: 1976-06-18
Final Drill Date: 1976-06-26
Well Total Depth: 777.20 m
Surface Hole Latitude: 51.449033
Surface Hole Longitude: -113.162021

For data sources see[1][2]

Well History

Date Event
1976-06-16 Obtained License
1976-06-20 Drill Stem Test Performed
1976-06-21 Drill Stem Test Performed
1976-06-22 Drill Stem Test Performed
1976-06-23 Drill Stem Test Performed
1976-06-25 Drill Stem Test Performed
1976-06-26 Finished Drilling
1976-06-26 Production Casing Operation Performed
1976-06-26 Well Mode changed to Drilled and Cased
1976-06-28 Well Log Performed
1976-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-20 Perforation Treatment Performed - Jet Perforation
1976-08-23 Perforation Treatment Performed - Fractured
1976-08-28 Perforation Treatment Performed - Fractured
1976-09-03 Perforation Treatment Performed - Jet Perforation
1976-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-07 Perforation Treatment Performed - Jet Perforation
1976-09-12 Perforation Treatment Performed - Fractured
1976-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-24 Perforation Treatment Performed - Jet Perforation
1976-09-28 Perforation Treatment Performed - Fractured
1976-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-17 Perforation Treatment Performed - Jet Perforation
1976-10-21 Perforation Treatment Performed - Fractured
1977-01-22 Well Began Production
1977-01-22 Well Fluid changed to Gas
1977-01-22 Well Mode changed to Flowing
1978-03-15 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-20 Perforation 740.10 744.30 7
1976-09-07 Acid Treatment 670.60 679.40 0
1976-09-12 Fracture 670.60 679.40 0
1976-09-24 Perforation 601.70 602.90 7
1976-09-24 Perforation 605.00 607.20 7
1976-09-24 Perforation 610.80 612.00 7
1976-09-24 Acid Treatment 601.70 612.00 0
1976-09-28 Fracture 601.70 612.00 0
1976-10-17 Perforation 509.00 511.80 0
1976-10-17 Acid Treatment 509.00 511.80 0
1976-10-21 Fracture 509.00 511.80 0
1976-08-20 Acid Treatment 740.10 744.30 0
1976-08-23 Fracture 740.10 744.30 0
1976-08-28 Fracture 740.10 744.30 0
1976-09-03 Perforation 693.40 694.60 7
1976-09-04 Acid Treatment 693.40 694.60 0
1976-09-07 Perforation 670.60 672.40 7
1976-09-07 Perforation 674.80 677.30 7
1976-09-07 Perforation 677.90 679.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 7176 0.0 0.0 0.0
1978 7374 0.0 0.0 0.0
1979 2659 0.0 0.0 0.0
1982 2208 0.0 0.0 0.0

For data sources see[5]

References