X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294230206020

Well Details

Well ID: 0294230206020
Loading map...
Location: 02/06-02-029-23W4/0
Location Alias: 02/06-02-29-23 W4M
Location Alias 2: 02/06-02-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 02
County/Municipality: Kneehill County
Well Name: ECA CARBON 6-2-29-23
Operator Name: Lynx Energy ULC
License Number: 0058526
License Date: 1976-06-03
License Status: Issued
Spud Date: 1976-06-04
Final Drill Date: 1976-06-07
Well Total Depth: 807.70 m
Surface Hole Latitude: 51.449052
Surface Hole Longitude: -113.135118

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-03 Obtained License
1976-06-07 Finished Drilling
1976-06-07 Production Casing Operation Performed
1976-06-07 Well Mode changed to Drilled and Cased
1976-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-15 Perforation Treatment Performed - Jet Perforation
1976-08-21 Perforation Treatment Performed - Fractured
1976-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-26 Perforation Treatment Performed - Jet Perforation
1976-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-01 Perforation Treatment Performed - Jet Perforation
1976-09-01 Well Mode changed to Drilled and Cased
1976-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-10 Perforation Treatment Performed - Jet Perforation
1977-01-16 Well Began Production
1977-01-16 Well Fluid changed to Gas
1977-01-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-15 Perforation 756.80 763.20 7
1976-09-01 Acid Treatment 637.30 654.70 0
1976-09-10 Perforation 552.60 554.10 7
1976-09-10 Perforation 556.90 559.60 7
1976-09-10 Perforation 562.70 563.90 7
1976-09-10 Acid Treatment 552.60 563.90 0
1976-08-15 Acid Treatment 756.80 763.20 0
1976-08-21 Fracture 756.80 763.20 0
1976-08-26 Perforation 686.10 689.80 7
1976-08-26 Perforation 690.70 694.60 7
1976-08-26 Acid Treatment 686.10 694.60 0
1976-09-01 Perforation 637.30 638.90 7
1976-09-01 Perforation 649.50 651.40 7
1976-09-01 Perforation 653.20 654.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 7623 0.0 0.0 0.0
1978 7420 0.0 0.0 0.0
1979 6120 0.0 0.0 0.0
1980 7585 0.0 0.0 0.0
1981 8282 0.0 0.0 0.0
1982 8227 0.0 0.0 0.0
1983 7019 0.0 0.0 0.0
1984 7008 0.0 0.0 0.0
1985 7938 0.0 0.0 0.0
1986 6854 0.0 0.0 0.0
1987 6569 0.0 0.0 0.0
1988 7038 0.0 0.0 0.0
1989 6713 0.0 0.0 0.0
1990 6370 0.0 0.0 0.0
1991 6832 0.0 0.0 0.0
1992 6636 0.0 0.0 0.0
1993 8549 0.0 0.0 0.0
1994 8757 0.0 0.0 0.0
1995 7292 0.0 0.0 0.0
1996 8781 0.0 0.0 0.0
1997 8747 0.0 0.0 0.0
1998 8342 0.0 0.0 0.0
1999 8334 0.0 0.0 0.0
2000 8679 0.0 0.0 0.0
2001 8679 0.0 0.0 0.0
2002 8751 0.0 0.0 0.0
2003 8558 0.0 0.0 0.0
2004 8187 0.0 0.0 0.0
2005 8540 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8719 0.0 0.0 0.0
2010 8678 0.0 0.0 0.0
2011 8715 0.0 0.0 0.0
2012 8666 0.0 0.0 0.0
2013 8623 0.0 0.0 0.0
2014 7614 0.0 0.0 0.0
2015 6967 0.0 0.0 0.0
2016 7468 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 8570 0.0 0.0 0.0
2019 8576 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References