X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294222510020

Well Details

Well ID: 0294222510020
Loading map...
Location: 02/10-25-029-22W4/0
Location Alias: 02/10-25-29-22 W4M
Location Alias 2: 02/10-25-029-22 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 22
Section: 25
County/Municipality: Kneehill County
Well Name: PINE CLIFF GPINE 10-25-29-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0398654
License Date: 2008-07-17
License Status: Issued
Spud Date: 2008-09-03
Final Drill Date: 2008-09-06
Well Total Depth: 1509.00 m
Surface Hole Latitude: 51.511868
Surface Hole Longitude: -112.965674

For data sources see[1][2]

Well History

Date Event
2008-07-17 Obtained License
2008-09-03 Surface Casing Operation Performed
2008-09-06 Finished Drilling
2008-09-06 Well Log Performed
2008-09-06 Well Mode changed to Drilled and Cased
2008-09-07 Well Log Performed
2008-09-08 Production Casing Operation Performed
2008-09-08 Rig Released
2008-09-19 Perforation Treatment Performed - Jet Perforation
2008-09-19 Well Log Performed
2008-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-12-08 Perforation Treatment Performed - Fractured
2008-12-08 Well Fluid changed to Gas
2008-12-08 Well Mode changed to Testing
2009-02-08 Well Fluid changed to Gas
2009-02-08 Well Mode changed to Test Completed
2009-10-29 Well Log Performed
2009-10-30 Perforation Treatment Performed - Jet Perforation
2009-10-30 Well Log Performed
2009-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-31 Plug Back Performed
2009-10-31 Well Fluid changed to Gas
2009-10-31 Well Mode changed to Abandoned Zone
2009-11-01 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-19 Perforation 1466.00 1471.00 20
2008-09-19 Perforation 1459.00 1462.00 20
2008-09-20 Acid Treatment 1459.00 1471.00 0
2008-12-08 Fracture 1459.00 1471.00 0
2009-10-30 Perforation 1440.00 1441.00 17
2009-10-31 Packing Device Capped w/Cement 1449.00 1457.00 0
2009-11-01 Fracture 1440.00 1441.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 16 0.0 0.0 0.0

For data sources see[5]

References