X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294213602000

Well Details

Well ID: 0294213602000
Loading map...
Location: 00/02-36-029-21W4/0
Location Alias: 00/02-36-29-21 W4M
Location Alias 2: 00/02-36-029-21 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 21
Section: 36
County/Municipality: Starland County
Well Name: CIGOL DRUMW 2-36-29-21
Operator Name: Canadian Natural Resources Limited
License Number: 0005938
License Date: 1953-01-09
License Status: RecCertified
Spud Date: 1953-02-22
Final Drill Date: 1953-03-21
Well Total Depth: 1690.70 m
Surface Hole Latitude: 51.519517
Surface Hole Longitude: -112.826491

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-01-09 Obtained License
1953-03-21 Finished Drilling
1953-03-21 Well Mode changed to Drilled and Cased
1953-03-22 Production Casing Operation Performed
1953-03-27 Well Began Production
1953-03-27 Well Fluid changed to Crude Oil
1953-03-27 Well Mode changed to Flowing
1963-03-22 Perforation Treatment Performed - Open-Hole Completion
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1986-02-28 Well Fluid changed to Crude Oil
1986-02-28 Well Mode changed to Suspended
1989-01-11 Well Fluid changed to Crude Oil
1989-01-11 Well Mode changed to Pumping
1989-01-12 Well Fluid changed to Crude Oil
1989-01-12 Well Mode changed to Suspended
1990-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-04 Perforation Treatment Performed - Jet Perforation
1990-09-04 Plug Back Performed
1990-09-04 Well Abandoned
1990-09-04 Well Fluid changed to Crude Oil
1990-09-04 Well Mode changed to Abandoned
1990-09-05 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-03-22 Open Hole/Barefoot Completion 1685.20 1690.70 0
1990-09-04 Packing Device Capped w/Cement 1656.00 1664.00 0
1990-09-04 Perforation 315.00 315.50 7
1990-09-05 Remedial Casing Cementing 315.00 315.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7091 0.0 0.0 0.0
1968 7187 0.0 0.0 0.0
1969 5627 0.0 0.0 0.0
1970 4336 0.0 0.0 0.0
1971 4428 0.0 0.0 0.0
1972 8559 0.0 0.0 0.0
1973 8622 0.0 0.0 0.0
1974 8483 0.0 0.0 0.0
1975 8612 0.0 0.0 0.0
1976 8612 0.0 0.0 0.0
1977 7989 0.0 0.0 0.0
1978 8735 0.0 0.0 0.0
1979 8663 0.0 0.0 0.0
1980 8711 0.0 0.0 0.0
1981 8676 0.0 0.0 0.0
1982 8646 0.0 0.0 0.0
1983 7388 0.0 0.0 0.0
1984 8275 0.0 0.0 0.0
1985 8456 0.0 0.0 0.0
1986 1272 0.0 0.0 0.0
1989 8 0.0 0.0 0.0

For data sources see[5]

References