X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294213416000

Well Details

Well ID: 0294213416000
Loading map...
Location: 00/16-34-029-21W4/0
Location Alias: 00/16-34-29-21 W4M
Location Alias 2: 00/16-34-029-21 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 21
Section: 34
County/Municipality: Starland County
Well Name: BEARSPAW ET AL DRUMW 16-34-29-21
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0009400
License Date: 1955-04-18
License Status: Issued
Spud Date: 1955-05-05
Final Drill Date: 1955-05-28
Well Total Depth: 1691.60 m
Surface Hole Latitude: 51.530945
Surface Hole Longitude: -112.866683

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-04-18 Obtained License
1955-05-27 Drill Stem Test Performed
1955-05-28 Finished Drilling
1955-05-28 Production Casing Operation Performed
1955-05-28 Well Mode changed to Drilled and Cased
1955-05-30 Perforation Treatment Performed - Jet Perforation
1955-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-06-02 Perforation Treatment Performed - Cement Squeeze
1955-06-03 Perforation Treatment Performed - Jet Perforation
1955-06-05 Well Began Production
1955-06-05 Well Fluid changed to Crude Oil
1955-06-05 Well Mode changed to Flowing
1966-08-19 Well Fluid changed to Crude Oil
1966-08-19 Well Mode changed to Pumping
1972-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-05-30 Perforation 1670.60 1671.80 13
1955-06-01 Acid Treatment 1670.60 1671.80 0
1955-06-02 Cement Squeeze 1670.60 1671.80 0
1955-06-03 Perforation 1665.10 1667.00 13
1955-06-03 Perforation 1559.90 1663.00 13
1972-07-29 Acid Treatment 1559.90 1667.00 0
1976-09-03 Acid Treatment 1559.90 1667.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7776 0.0 0.0 0.0
1968 5785 0.0 0.0 0.0
1969 7199 0.0 0.0 0.0
1970 7892 0.0 0.0 0.0
1971 7951 0.0 0.0 0.0
1972 8325 0.0 0.0 0.0
1973 7798 0.0 0.0 0.0
1974 8176 0.0 0.0 0.0
1975 6671 0.0 0.0 0.0
1976 8479 0.0 0.0 0.0
1977 8559 0.0 0.0 0.0
1978 8759 0.0 0.0 0.0
1979 4008 0.0 0.0 0.0
1980 8406 0.0 0.0 0.0
1981 8110 0.0 0.0 0.0
1982 7981 0.0 0.0 0.0
1983 8583 0.0 0.0 0.0
1984 8013 0.0 0.0 0.0
1985 8517 0.0 0.0 0.0
1986 8269 0.0 0.0 0.0
1987 8620 0.0 0.0 0.0
1988 7166 0.0 0.0 0.0
1989 7771 0.0 0.0 0.0
1990 8577 0.0 0.0 0.0
1991 8592 0.0 0.0 0.0
1992 8740 0.0 0.0 0.0
1993 8050 0.0 0.0 0.0
1994 6648 0.0 0.0 0.0
1995 6833 0.0 0.0 0.0
1996 7559 0.0 0.0 0.0
1997 5137 0.0 0.0 0.0
1998 5759 0.0 0.0 0.0
1999 3487 0.0 0.0 0.0
2000 2966 0.0 0.0 0.0
2001 484 0.0 0.0 0.0
2003 3518 0.0 0.0 0.0
2004 1454 0.0 0.0 0.0
2005 762 0.0 0.0 0.0
2006 2754 0.0 0.0 0.0
2007 966 0.0 0.0 0.0
2008 5175 0.0 0.0 0.0
2009 2483 0.0 0.0 0.0
2010 3344 0.0 0.0 0.0
2011 1717 0.0 0.0 0.0
2013 4808 0.0 0.0 0.0
2014 4263 0.0 0.0 0.0
2015 5002 0.0 0.0 0.0
2016 3752 0.0 0.0 0.0
2017 387 0.0 0.0 0.0
2018 4810 0.0 0.0 0.0
2019 2552 0.0 0.0 0.0
2020 413 0.0 0.0 0.0

For data sources see[5]

References