If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294212312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.499553,"lon":-112.863078,"icon":""}]} |
Location: 00/12-23-029-21W4/0 | |
Location Alias: 00/12-23-29-21 W4M | |
Location Alias 2: 00/12-23-029-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 21 | |
Section: 23 | |
County/Municipality: Kneehill County | |
Well Name: ERC WEST DRUMHELLER 12-23-29-21 | |
Operator Name: TAQA North Ltd. | |
License Number: 0245339 | |
License Date: 2000-11-29 | |
License Status: Amended | |
Spud Date: 2000-12-05 | |
Final Drill Date: 2000-12-11 | |
Well Total Depth: 1446.00 m | |
Surface Hole Latitude: 51.499553 | |
Surface Hole Longitude: -112.863078 |
Date | Event |
---|---|
2000-11-29 | Obtained License |
2000-12-06 | Surface Casing Operation Performed |
2000-12-07 | Direction Drilling Operation Performed - Deviate |
2000-12-11 | Finished Drilling |
2000-12-11 | Well Log Performed |
2000-12-12 | Production Casing Operation Performed |
2000-12-14 | Rig Released |
2000-12-14 | Well Mode changed to Drilled and Cased |
2001-01-27 | Perforation Treatment Performed - Jet Perforation |
2001-02-12 | Well Began Production |
2001-02-12 | Well Fluid changed to Gas |
2001-02-12 | Well Mode changed to Flowing |
2001-02-22 | Perforation Treatment Performed - Fractured |
2001-04-11 | Perforation Treatment Performed - Jet Perforation |
2001-04-13 | Perforation Treatment Performed - Fractured |
2001-04-13 | Well Fluid changed to Gas |
2001-04-13 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2000-12-07 | 640.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-01-27 | Perforation | 1420.00 | 1425.00 | 14 |
2001-01-27 | Perforation | 1415.00 | 1420.00 | 14 |
2001-02-22 | Fracture | 1415.00 | 1425.00 | 0 |
2001-04-11 | Perforation | 1199.50 | 1205.50 | 17 |
2001-04-13 | Fracture | 1199.50 | 1205.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 6218 | 0.0 | 0.0 | 0.0 |
2002 | 4833 | 0.0 | 0.0 | 0.0 |
2003 | 4268 | 0.0 | 0.0 | 0.0 |
2004 | 8575 | 0.0 | 0.0 | 0.0 |
2005 | 8625 | 0.0 | 0.0 | 0.0 |
2006 | 8703 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8693 | 0.0 | 0.0 | 0.0 |
2009 | 8747 | 0.0 | 0.0 | 0.0 |
2010 | 8706 | 0.0 | 0.0 | 0.0 |
2011 | 8581 | 0.0 | 0.0 | 0.0 |
2012 | 8678 | 0.0 | 0.0 | 0.0 |
2013 | 7919 | 0.0 | 0.0 | 0.0 |
2014 | 2872 | 0.0 | 0.0 | 0.0 |
2015 | 4874 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8639 | 0.0 | 0.0 | 0.0 |
2018 | 8642 | 0.0 | 0.0 | 0.0 |
2019 | 8736 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]